Gas Supply; Electrical; Blower Operation; Clearances - Pacific energy The Mirage A Series Installation And Operating Instructions Manual

Vented room heater
Table of Contents

Advertisement

GAS SUPPLY

The Mirage Gas Appliance comes equipped with a 3/8" N.P.T. Male
inlet for easy gas connection. This connection is located under the
burner assembly.
Correct gas pressure requirement:
Min Pressure
(For purpose of input adjustment)
Max Pressure
Manifold Pressure
To remove burner assembly:
1) Lift glass up by the bottom tabs, until it clears the bottom shelf
and remove.
2) Remove all logs from firebox, taking care not to damage them.
3) Remove 2 screws located in the front bottom holding burner in
place (see Fig. # 6)
4) Lift burner up on the left side, just enough to slide whole
assembly to the left to disconnect from the orifice.
f i r e - p a r t s . c o m
5) Remove burner through front opening.
To replace burner assembly:
Reverse above procedure.
Fig # 6
Remove Screws
Gas supply piping may enter the cabinet from any side. Proper gas
line diameter must be used to assure proper operation. A pressure
test port (1/8 inch N.P.T. plugged tapping) must be provided for
checking gas pressure. This port must be located immediately
upstream of the gas supply connection to the appliance.

ELECTRICAL

No electrical connection is required for the gas system operation.
The self generating pilot provides current for the optional remote wall
switch. (See fig. # 4 for proper installation of remote wall switch.)
Circulating air blower electrical rating: 115V, 60HZ, 80 watts. (See
Fig. # 7 for blower wiring diagram) For your protection against shock
hazard, use only a properly grounded outlet that will accept a three-
pronged plug. Do not cut or remove the grounding prong.
Natural Gas
Propane
5.0" wc
11.0" wc
10.5" wc
13.0" wc
3.5" wc
10.0" wc
Consult local codes or, in the absence of local codes, with the
current CSA C22.1 Canadian Electrical Code and in the USA with
the National Electrical Code, ANSI/NFPA 70 (Latest Edition)
Fig # 7
BLOWER
SPEED
SNAP DISC
CONTROL
SWITCH

BLOWER OPERATION

The circulating air blower is thermostatically controlled and will not
operate if appliance is cold. A few minutes after the appliance is lit
and the variable speed control set at a desired setting, the blower will
automatically turn on. The blower will automatically turn off a few
minutes after the appliance is shut down.

CLEARANCES

The minimum clearances from the appliance to combustibles are
shown on Fig. # 8. For purpose of servicing, a 12" right side (side
with controls) clearance is recommended. Adequate clearances
around air openings and combustion air supply are required.
Minimum Clearance
to Combustibles
1"
3"
1"
3"
3"
Sidewall to Appliance
Rearwall to Appliance
Corner to Appliance
Mantel to Appliance
Maximum
Mantel Extension
Single Wall Vent Pipe
115 VOLTS
60 Hz
0.5 AMPERES
If any of the original
wire must be replaced,
it must be replaced with
type GTF wire or its
equivalent.
G (green)
L2 (black)
L1 (white)
Fig. # 8
2"
2"
3 in
(76 mm)
1 in.
(25 mm)
2 in.
(51 mm)
20 in. (305 mm)
6 in.
(152 mm)
6 in.
(152 mm)
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents