9.2 Live mains cables
Task: The route of a live electric cable must be traced above ground.
CTT33: Connect one transmitter output to the protective earth, e.g. to a wall socket PE contact. To trace
-
the feeder cable of a metallic light pole, connect transmitter output to the earthed pole itself. Connect
transmitter second output with a ground pick to soil as far as possible.
CL43: Use SA43 probe. Trace the cable route by pointing
-
the probe to the signal minimum. If necessary, define
cable depth as described in the previous paragraph.
CT33 User Manual v. X1.0
16