5.2.2 Verification of delivery

Contact your supplier immediately in case of damage or an incomplete delivery. The delivery includes:
• Xcell 350V EC BP: check whether it is the correct type on the Rating plate
• Manual
• Fixing bracket.
The Xcell 350V EC BP is supplied in the following types:
• Xcell 350V EC BP left
• Xcell 350V EC BP right
5.3 WaIl mounting
Mount the Xcell 350V EC BP against a wall with a mass of at least 200 kg/m, or on a floor-mounted
frame (optional). This reduces contact noise as much as possible. For other wall types, use anti-
vibration plugs.
Mount the suspension bracket supplied with the unit to the wall, ensuring it is level.
The condensation drain is mounted under the Xcell 350V EC BP.
The stated dimension of 235 mm is an indication only, and is dependent on the type of condensation
drain selected; also refer to 'condensation drain'.
Ensure a space of at least 1metre below the unit for maintenance purposes.
The Xcell 350V EC BP does not require any space at the sides for effective operation.

5.3.1 Connection of ducts

First mount a straight section of duct of at least 500 mm, or mount the silencer straight. The connecting
air ducts (160mm dia.) must be installed with as little air resistance as possible and must be free from