UnderCover APEX BASE-CAMP TENT User Handbook Manual page 6

Table of Contents

Advertisement

It is important that you read this carefully before attempting the Setup!
Base-Camp Setup:
Place the shelter in the center of the
area to be covered.
1
Expand frame to arms length.
Lift frame at middle position and
step backwards until open fully.
3
Lock each corner.
All rights reserved Undercover
Operating Instructions
TM
2
2016
®
Step on footplate, pull leg upward
until it locks in the first extended position.
5
Insert the fabric pocket under the leg
footplate, extend all four legs to the
second and highest lock position.
Extend the tie-down ropes aprox 5'
from each corner on the roof-line and
properly stake.
Takedown:
1) Sparate dome-room from base-
camp.
2) Remove footplate and tie-down
stakes.
2) Lower all four telescopic legs.
3) Release all four red corner-sliders
4) From middle position lift frame
and walk inward until closed.
4
6

Advertisement

Table of Contents
loading

Table of Contents