Download Print this page

Pearl Iron Jet IRONJ 05 Installation And Operating Instructions page 4

Shallow well jet pumps

Advertisement

8. VOLTAGE CHANGE PROCEDURE
8.1 VOLTAGE CHANGE PROCEDURE FOR IRONJ 05 - IRONJH 05 - IRONJ 07
8.2 VOLTAGE CHANGE PROCEDURE FOR IRONJ 10 - IRONJ 15
9. PEARL MOTOR DATA
MOTOR
HP
PART #
IRON J-05
0.5
115V / 230V
IRON J-07
0.75
115V / 230V
IRON J-10
1
115V / 230V
IRON J-15
1.5
115V / 230V
PD WATER SYSTEMS - 3000 W. 16 Ave. Miami, FL 33012. TEL: (954) 474 9090 FAX: (954) 889 0413
www.pdwatersystems.com
1
Unscrew and
remove the cover.
2
Check the voltage
set from factory.
1
Unscrew and
remove the cover.
2
Remove the
Voltage plug.
SERVICE
VOLTS
PHASE
FACTOR
1
1
1
1
3
If you want to
power the pump
with 115 V,
rotate the plug
to 115 V.
4
If you want to
power the pump
with 230 V,
rotate the plug
to 230 V.
3
Install the Voltage
Plug aligning the
arrow with the
voltage needed.
4
Choose connection
for 230 V.
Pump MAX.
LOAD AMPS
1.90
10.8 / 5.4
1.90
14.2 / 7.1
1.75
16.6 / 8.3
1.60
21 / 10.5
WA TER SYSTEMS
|
10. PEARL MOTOS ARE PRE-WIRED BY HP:
- 1/2 wired for 115 Volt.
- 3/4 - 1 1/2 HP wired for 230 Volt.
pdwatersystems
5
Close the cover.
5
Choose connection
for 115 V.
6
Reinstall the cover
back.

Advertisement

loading

This manual is also suitable for:

Iron jet ironjh 05Iron jet ironj 10Iron jet ironj 07Iron jet ironj 15