Cool Compact SKFME Series Operating Manual

Cool Compact SKFME Series Operating Manual

Blast chiller - freezer

Advertisement

Quick Links

OPERATING MANUAL
Blast chiller - freezer
5 X GN 1/1 – 15 X GN 1/1
Series: SKFME / SKFZK

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SKFME Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Cool Compact SKFME Series

  • Page 1 OPERATING MANUAL Blast chiller - freezer 5 X GN 1/1 – 15 X GN 1/1 Series: SKFME / SKFZK...
  • Page 2: Table Of Contents

    CONTENTS Page PRELIMINARY REMARKS PURPOSE OF USE GENERAL TIPS SAFETY REGULATIONS TECHNICAL DATA INSTALLATION Transport and handling of the equipment Unpacking and setting Electrical connection Connection of an external unit 6.4.1 Setting 6.4.2 Electrical connection 6.4.3 Connection of coolant hoses Tips concerning installation Equipment in the standby mode Equipment in the cooling mode...
  • Page 3: Preliminary Remarks

    1. PRELIMINARY REMARKS Thank you for buying our blast chiller-freezer. All our products are subject to constant quality control. Please read the manual carefully so as to be able to enable long and problem-free use of our products. The operating manual is intended to provide the following information: •...
  • Page 4: Technical Data

    In the course of the design and the production of the blast chillers-freezers, particular attention was paid to observance of the safety rules, which enable the user to use the equipment safely. • In order to avoid accidental touching of live cables, the equipment is fitted with metal guards. Such protections may be removed only by qualified personnel.
  • Page 5: Installation

    The manufacturer is not responsible for improper use of the product. The manufacturer also reserves the right to make the necessary and useful changes in its products that the manufacturer finds necessary, without changing its basic functions. 6. INSTALLATION Setting, installation, connection, and maintenance work on the blast chiller-freezers may be performed only by a person who builds cooling equipment and/or a technically qualified and authorized manufacturing company.
  • Page 6 Data plate (on the back) Control panel Door Door Legs with height adjustment Unit chamber with a grate air inlet cover Removable condensate container...
  • Page 7: Electrical Connection

    6.3. ELECTRICAL CONNECTION The equipment is delivered without the plug for connecting to the power supply line. This connection must be made by qualified workers. If the connection is made by the user or by unqualified workers, the manufacturer will be exempted from any and all responsibility.
  • Page 8: Electrical Connection

    After the unit has been unpacked, perform the following procedure: • Set the equipment on a stable ground. • Set the unit under an appropriate cover that will protect it against the weather and at the distance of 10 m from the blast chiller-freezer. •...
  • Page 9: Equipment In The Standby Mode

    Quick cooling: enables starting the quick cooling cycle. Freezing: enables starting the freezing cycle. Other: enables access to other functions. Standby: enables access to the standby mode (the machine is switched off). In order to leave the standby mode, move the red squares from the left side to the right side.
  • Page 10: Cycle In Progress

    Edition: enables entering or changing the program. 7.5. Cycle in progress The date, time, and current function. Readout of the current time and temperature. Values set by the user: The yellow values are the reference values to be achieved. Fan controller: If the color of the symbol is grey, the speed of the internal fans cannot be changed.
  • Page 11: Machine In The Heating Mode

    Green arrow: enables going to the next page. NOTE: Heating is switched on automatically before the thawing process, the Slow Cooking process, and the proofing process; this is beneficial because it makes it possible to increase the temperature inside the machine (empty) in order to reduce the time of the next cycle.
  • Page 12: Alarms

    Help: going to the new range, Screen: enables setting the brightness of the which contains several useful screen, the time when the screen saver is switched instructions for the service on, and the configuration of the screen saver. technician and for the user. In this range, demonstration films are ON/OFF: enables observation of the status of the presented (option).
  • Page 13: Usb

    On the other hand, if the multilevel function is activated, the quick cooling and freezing time is equal to the time set for the last sheet metal. 7.12. USB Export HACCP: makes it possible to save copies of all HACCP data to a USB memory. The quantity of the data saved in the memory of the machine depends on the length of the period of its use.
  • Page 14: Haccp Report

    7.13. HACCP report In order to access the HACCP report, press the HACCP symbol; then select the appropriate day to verify the HACCP data and confirm by pressing the search button. A table is displayed where all cycles conducted in a given day can be seen.
  • Page 15 The SIM card slot is located on the The machine responds to such an inquiry by sending right side of the screen and is protected the following information: with a protective guard that can be S/N - serial number of the machine opened from the left side to the right 51 - temperature probe, air side.
  • Page 16: Maintenance

    8. MAINTENANCE Read the instructions contained in this chapter carefully. They contain the basic principles of maintenance of the blast chiller-freezer. 8.1. SAFETY When performing works related to cleaning, keep in mind the following safety rules (see also item 3): •...
  • Page 17: Non-Standard Maintenance Work

    8.4. NON-STANDARD MAINTENANCE WORK Any non-standard maintenance work must be performed only by qualified workers, a technician, or an installer. The manufacturer does not accept responsibility for work on the equipment that has been neglected but is listed in this manual. 9.
  • Page 18: Wiring Diagram

    11. CONNECTIONS LAYOUT...
  • Page 22: Declaration Of Conformity

    - Part 5: Blast chiller and blast freezer; Requirements and testing This declaration loses its validity in the event of any changes to the equipment that have not been approved by us. Valid as of: June 2014 Cool Compact Kühlgeräte GmbH 220220.200/135.03.2015...

This manual is also suitable for:

5 x gn 1/1Skfzk series15 x gn 1/1

Table of Contents