5. After use

5.1 Inspection
The inspection of Barry B-Net Systems must be carried out before and after each use (in accordance with
Appendix A) by personnel who have received and reviewed the information contained in the present document.
Maintain an updated logbook of the frequency of use and inspections of this product.
5.2 Roll-up of nets
Step 1: Remove snow/ice from nets
Step 2: Align net to be re-wound in a straight line. Position the net so that one of the ID labels will face the
exterior of the net.
Step 3: Tie-off using webbing straps supplied on the net edge. Alternately, users may prefer to attach the corners
by feeding through the poles (top and bottom) without the use of the tie straps.
Step 4: Place the nets in the appropriate transport/storage cradles.
5.3 Storage
Nets should be stored clean, dry and out of direct sunlight, and away from extreme heat and in a well-ventilated
storage area. Nets should be kept off the floor and stored upright, on racks, to provide ventilation underneath. It
is better to store the nets vertically to allow drainage and prevent contact of the fiber with the ground. Never
store directly on a concrete, metal or dirt floor, and under no circumstances should nets and/ or acid and/ or
alkalis by kept in the same building. Product life will be shortened by chemical and corrosive products or
excessive temperatures.