INDEX OUF88 Technical Specifications OUF 88 Installation Troubleshooting and maintenance Wiring Diagram System description and parts Accessories – Leak detection system Leak detection system wiring diagram Installation examples Display quick reference list...
Once reached the low level, you can release the start button, because the OUF works in automatic mode. 4/ Once the oil has filled the OUF 88 reservoir to the programmed maximum level (80% approx), the working level switch will stop the pump.
Check suction line vacuum tightness, tube size, and distances related to suction limits of your OUF 88. If the oil does not come up to the OUF 88: Check suction pipe for blockage and/or vacuum tightness. Is your vertical lift height lower than 8 mt?
Oil tray with leak detection system An oil tray with an infrared leak detection system is available for your OUF. This optional oil tray is strongly recommended, particularly in the event that the overflow pipe is not connected. In some regions, the use of the oil tray can be compulsory under certain local standards.
OUF 88 with leak detection system. Wiring diagram Connections above detailed by dashed line, have to be fitted by the leak detection system installer. An insulated three wire cable is provided for this purpose. Note: The is only operational when the Leak Detector & L.D. Board...
Display quick reference list Fix light: Flashing Light: Normal Operation Status: OUF 88 Oil Lifter is powered. Pump filling No Power Supply OUF reservoir Oil in lifter reservoir arrived till stop level. It keeps this state till low level is reached again, or start button is pushed.
Need help?
Do you have a question about the OUF 88 and is the answer not in the manual?
Questions and answers