Mutli-stage seawater high pressure pumps (46 pages)
Summary of Contents for FEDCO MSD-350
Page 1
English Version INSTALLATION & OPERATION MANUAL MSD™ MULTI-STAGE DUPLEX HIGH PRESSURE PUMPS Models: MSD-160 ● MSD-200 ● MSD-350 ● MSD-400 MSD-270 www.fedco-usa.com ONE COPY OF THIS MANUAL MUST REMAIN WITH THE EQUIPMENT AT ALL TIMES MSD 160-400 Installation Operation Manual, 08-160-XXXXXX-0...
Page 2
FEDCO Certifications ISO 9001 and ISO 14001: FEDCO has adopted the ISO 9001 standard to define and develop our Quality Manage- ment System (QMS.) The QMS allows FEDCO to better serve our customers’ needs through continuous improvement of the quality, delivery, and efficiency of our products.
This includes any modification company regulations. to the equipment or the use of parts not provided by FEDCO. If there is a question regarding the intend- In the Work Area ed use of the equipment, please contact a FEDCO •...
Installation Procedures Continued Optional Horizontal Baseplate Installation Some units include an optional FEDCO baseplate which provides good mounting surfaces for the motor and pump. It also increases accuracy during the alignment process. Although the base- plate is precisely manufactured, it requires a solid foundation such as a concrete pad or rigid steel substructure.
Page 42
FEDCO please refer to the Start-Up Record section in the back of this manual or contact FEDCO for more information. Figure 76 - Install Dropout Coupling On Motor Shaft 5. Create gap between coupling hubs for pre- alignment procedure.
If after consulting the troubleshooting charts the cause is still undefined, contact FEDCO technical support by e-mail (fedco-usa.com and choose the “Service and Support” tab), telephone or FAX. FEDCO will give you easy, step by step instructions on how to proceed.
Service Parts Kits NOTES: Please provide pump serial number when ordering field service kits. Ordering Parts To order a component or service kit, simply contact a FEDCO representative at: ATTN: Field Service Department Additional Contact Information: FEDCO...
Alignment). 9. Visually inspect flexible coupling and tighten the coupling bolts to the specified torque as nec- essary. 10. Fill out and submit all warranty documentation to FEDCO. Six (6) months after commissioning 1. Inspect pump alignment (refer to Final Pump Alignment).
FEDCO with the RMA clearly marked on the package. We need this number to ensure proper handling of the returned parts and supply of new parts, if needed. Ask FEDCO for details of the repair warranty. Parts will be replaced in accordance with the FEDCO warranty.
Series Warranty Registration Form THIS FORM MUST BE COMPLETED AND RETURNED TO FEDCO TO ACTIVATE YOUR WARRANTY COVERAGE. FEDCO will send confirmation of start of warranty coverage Please FAX this page to FEDCO to register your warranty. Retain the original for your future information.
Need help?
Do you have a question about the MSD-350 and is the answer not in the manual?
Questions and answers