2.1 SITE REQUIREMENTS

The appliance is designed to be installed in an airing/cylinder cupboard and the
relevant minimum dimensions are provided in section 1.2 Technical Data.
Because of the ease of installation we recommend that the cupboard construction
is completed and painted before installation of the appliance. The cupboard door
can be fi tted after installation.
If the unit needs to be stored prior to installation it should be stored upright in a dry
environment and on a level base/fl oor.
Installation and maintenance access is needed to the front of the appliance and
above the F & E cistern. See Technical Data section for further details.
The minimum dimensions contained in section 1.2 Technical Data allow for the
passage/connection of pipes to the appliance from any direction as long as the
appliance is installed on the installation base provided. If the installation base is
not used extra space may be needed to allow connection to the pipework and the
whole of the base area should be continuously supported on a material which will
not easily deteriorate if exposed to moisture.
The fl oor of the cupboard needs to be level and even and capable of supporting
the weight of the appliance when full. Details of the weight when full is provided
in section 1.2 Technical Data.
The appliance is designed to operate as quietly as practicable. However, some noise
(from pumps etc) is inevitable in any heating system. This will be most noticeable
in cupboards formed on bulkheads, or at the mid span of a suspended fl oor. In these
cases the situation can be improved by placing the appliance on a suitable sound
deadening material (i.e. carpet underlay or similar).
Cupboard temperatures will normally be higher than in a conventional system and
the design of the cupboard and door will need to take this into account. No ventilation
is normally required to the cupboard.
A suitable location will be needed for the separate feed and expansion cistern
and expansion vessel. This will often be at high level in the cupboard housing the
SysteMate 2000. The dimensions and clearances are provided in section 1.2 Technical
Data. The location will need to provide a suitable route for the cold feed/expansion
pipe and the open safety vent pipe for the appliance as well as the connecting pipe
to the system expansion vessel. The location will also need to provide a suitable
route and discharge position for the warning/overfl ow pipe and the ballvalve supply
from the mains cold water system if these are being fi tted.
Note: The standard appliance is supplied with a cistern without a ballvalve/
overfl ow for fi lling manually.
An electrical supply must be available which is correctly earthed, polarized and in
accordance with the latest edition of the IEE requirements for electrical Installations
BS 7671.
The electrical mains supply needs to be 230V/50Hz/1Ph
Connection must be made using a double-pole linked isolator with a contact
separation of 3mm in both poles which is located within 1m of the appliance. The
supply must only serve the appliance.
The supply to the standard appliance shall be fused at 3 amp - nominal maximum full
load current for all SM models = 1.4 amps (this does not include the boiler).

2.0 INSTALLATION

If the 'Switch' electrical emergency backup
is being provided, the minimum breaking
capacity of the main isolation switch and
cable sizes/lengths at 230V shall follow the
recommendations in the table below.
Nominal
Min
full load
rating of
current
isolating
switch
41.0
45 Amps
Amps
Recommended
45A type 1 - M.C.B. to BS 3871
circuit protection
45A type B circuit breaker to
device - based
BS EN 60898
on 0.4 second
disconnection time
Electrical Supply requirements for
SysteMate
Page 16
Cable
Max. recommended
size
cable run-based
on 9.2V drop
and 0.4 second
disconnection
time using a type
1 or B breaker
2
10mm
49 metres
2000
with Switch