3.0 SAFE PULLING FORCE FOR HDD

3.0 SAFE PULLING FORCE FOR HDD
Based on the pulling head design directly connected to the Eagle Loc 900
Based on the pulling head design directly connected to the Eagle Loc 900
Internal restraint pipe string, the following is our recommendation for the
Internal restraint pipe string, the following is our recommendation for the
safe pull load in straight pulling of our Eagle Loc 900, as well as the bending
safe pull load in straight pulling of our Eagle Loc 900, as well as the bending
3.0 SAFE PULLING FORCE FOR HDD
radius of C900 PVC Pressure Pipe:
radius of C900 PVC Pressure Pipe:
Based on the pulling head design directly connected to the Eagle Loc 900
Internal restraint pipe string, the following is our recommendation for the
SAFE PULLING FORCE FOR HORIZONTAL DIRECTIONAL DRILLING
SAFE PULLING FORCE FOR HORIZONTAL DIRECTIONAL DRILLING
SAFE PULLING FORCE FOR HORIZONTAL DIRECTIONAL DRILLING
SAFE PULLING FORCE FOR HORIZONTAL DIRECTIONAL DRILLING
safe pull load in straight pulling of our Eagle Loc 900, as well as the bending
NOMINAL
NOMINAL
NOMINAL
NOMINAL
radius of C900 PVC Pressure Pipe:
DIAMETER, CIOD (IN)
DIAMETER, CIOD (IN)
DIAMETER, CIOD (IN)
DIAMETER, CIOD (IN)
SAFE PULLING FORCE FOR HORIZONTAL DIRECTIONAL DRILLING
NOMINAL
DIAMETER, CIOD (IN)
Table 2
Table 2
4.0 C900 PULL HEAD INSTALLATION PROCEDURE
4.0 C900 PULL HEAD INSTALLATION PROCEDURE
Step 1: Align pull head with the end of the C900 PVC pipe.
Step 1: Align pull head with the end of the C900 PVC pipe.
Table 2
Table 2
Table 2
4.0 C900 PULL HEAD INSTALLATION PROCEDURE
Step 1: Align pull head with the end of the C900 PVC pipe.
NOMINAL
NOMINAL
DIAMETER, (inches)
DIAMETER, (inches)
Figure 13: Step 1
Figure 13: Step 1
Step 2: Install pull head over the top of the C900 PVC pipe. Install the pull
Step 2: Install pull head over the top of the C900 PVC pipe. Install the pull
head where PVC pipe extends the end cap of the pull head.
head where PVC pipe extends the end cap of the pull head.
Figure 13: Step 1
Step 2: Install pull head over the top of the C900 PVC pipe. Install the pull
head where PVC pipe extends the end cap of the pull head.
16
EAGLE LOC 900
16
EAGLE LOC 900
Table 3
SAFE PULLING FORCE FOR
HORIZONTAL DIRECTIONAL DRILLING
SAFE PULL LOAD STRAIGHT
SAFE PULL LOAD STRAIGHT
SAFE PULL LOAD STRAIGHT
SAFE PULL LOAD STRAIGHT
4
4
4
4
6
6
6
6
8
8
8
8
10
SAFE PULL LOAD STRAIGHT
10
10
10
12
12
12
12
4
14
14
6
16
16
8
18
18
10
20
20
12
24
24
MINIMUM BENDING RADII AND OFFSETS FOR AWW C900 PIPE
MINIMUM BENDING RADII AND OFFSETS FOR AWW C900 PIPE
4
4
6
6
8
8
10
10
12
12
14
14
16
16
18
18
20
20
24
INSTALLATION GUIDE
INSTALLATION GUIDE
24
ALIGNMENT (LBS)
ALIGNMENT (LBS)
ALIGNMENT (LBS)
ALIGNMENT (LBS)
15,000
15,000
15,000
15,000
20,000
20,000
20,000
20,000
30,000
30,000
30,000
30,000
40,000
40,000
40,000
40,000
ALIGNMENT (LBS)
45,000
45,000
45,000
45,000
15,000
50,000
50,000
20,000
60,000
60,000
30,000
70,000
70,000
40,000
80,000
80,000
45,000
100,000
100,000
MINIMUM BENDING
MINIMUM BENDING
RADIUS (feet)
RADIUS (feet)
100
100
144
144
189
189
232
232
275
275
319
319
363
363
406
406
450
450
538
538
MINIMUM BENDING
MINIMUM BENDING
MINIMUM BENDING
MINIMUM BENDING
RADIUS (feet)
RADIUS (feet)
RADIUS (feet)
RADIUS (feet)
100
100
100
100
144
144
144
144
189
189
189
189
232
MINIMUM BENDING
232
232
232
RADIUS (feet)
275
275
275
275
100
319
319
144
363
363
189
406
406
232
450
450
275
538
538
MAXIMUM ALLOWABLE
MAXIMUM ALLOWABLE
OFFSET (inches)
OFFSET (inches)
24
24
17
17
13
13
10
10
9
9
9.4
9.4
8.2
8.2
7.4
7.4
6.7
6.7
5.6
5.6