Page 3
Step 1. Before you start building, you will need to: 1. Prepare your workspace. 2. Unpack and carefully stack components to one side to free up base for the shed.
Front flush 28mm Tip: Fix LM30-181-SPG to BR75-181-0. Position the flush at the front and al- low for side and rear walls to sit on the BR75-181-0. Refer to the Shed1800 base construction guide. UI Code: Quantity: BR75-181-0 LM30-181-0 LM30-181-SPG...
Step 5. Tip: Ensure the bottom of the posts are level with the bottom base planks. Refer to fixing guide for further information on how to secure the corner posts. Fixing groove 25mm UI Code: Quantity: LR181 RR181 CP01-181-LR CP01-181-RR LF181 RF181 CP01-181-LF...
Page 8
Step 6. Tip: Stack up MiniCLT planks and skew screw with SC50 screws. Once all planks are in place, secure SC75 screws at the top, middle and bottom of corner posts. Refer to fixing guide. Fixing groove UI Code: Quantity: LAM30 LM30-181-0 LM30-181-SP...
Page 15
Step 13. Tip: 1. Use PB100 to secure the doors. Refer to fixing guide. Ensure there is an even gap around the doors. 7-10mm gap UI Code: Quantity: PRE MADE DOORS H200 PB150 PB100 SC40...
Page 16
Step 14. Tip: Even up the gap in the doors by adjusting the base if required. UI Code: Quantity: TR03-181-DE...