Download Print this page

Silver King SKFSM Technical Manual And Replacement Parts List

Refrigerated shake station

Advertisement

Quick Links

Refrigerated Shake Station 
1600 Xenium Lane North, Minneapolis, MN 55441-3787
Phone (763) 923-2441
FORM NO. 38447 REV K 09/2018
Technical Manual 
Replacement Parts List 
  
and 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Specifications Subject to Change Without Notice.
1
MODEL SKFSM

Advertisement

loading

Summary of Contents for Silver King SKFSM

  • Page 1     Refrigerated Shake Station                            MODEL SKFSM 1600 Xenium Lane North, Minneapolis, MN 55441-3787 Phone (763) 923-2441 FORM NO. 38447 REV K 09/2018 Specifications Subject to Change Without Notice.
  • Page 2 INSPECT FOR DAMAGE AND UNCRATE Upon delivery of your new Silver King unit, uncrate at once to inspect for possible freight damage following the instructions printed on the exterior of the container. Report any damages to the carrier responsible for transportation and promptly present a claim for any evidence of mishandling.
  • Page 3: Installation

    -2 inches on the sides and 2 inches above the cabinet  The unit must be level or tilted backwards slightly. Energy Rating Your Silver King refrigerator has a class 5 energy rating. The refrigerator was tested at an ambient temperature of 40°C at 40% relative humidity.  ...
  • Page 4 Defrost Your Silver King refrigerator will defrost naturally and no additional plumbing is required. Evaporator defrosting is accomplished when frost buildup on the Evaporator Coil is cleared during Compressor “off” cycles. Defrost water is collected in a pan located in the compressor compartment where it is evaporated into the room air.
  • Page 6       WHEN ORDERING REPLACEMENT PARTS, PLEASE PROVIDE MODEL AND SERIAL NUMBERS.
  • Page 7      ...
  • Page 8 Five (5) Year Compressor Warranty Silver King warrants to the original purchaser for a period of five (5) years from the date of original purchase or five (5) years and six (6) months from the date of shipment from the factory, whichever comes first, that it will replace the compressor with one of similar design and capacity, exclusive of delivery and installation charges, if it is found to Silver King’s satisfaction to be inefficient or inoperative due...