Advertisement

Quick Links

SLB34BLW Bundles Required:
4300269
ST205/75R15D Denman Tire/TS Dir Rim ... 2
(or)
4300268
ST205/75R15D Denman Tire/Galv Dir Rim . 2
68224
Brake Box w/Hardware ................................ 1
69082
Literature Bag - Trailers - Brakes ................ 1
80248--
Frame Bundle - 2X4W B34BLW ................. 1
66996--
Tongue Assembly 55", W/UFP Actuator ...... 1
ShoreLand'r offers their product line in either galvanized or
painted finish. When ordering parts it is important that you
specify the finish or color you have on your product. The five
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various finishes. When
ordering these items use the five (5) digit number along with
a two (2) digit suffix for the proper finish.
00 ......... Galvanized
01 ......... Arctic White
03 ......... Black
33 ......... Galvanized w/Black Plastic Parts
Midwest Industries, Inc.
Page 1
®
SLB34BLW
Ida Grove, IA 51445

Table of Contents:

Frame Drawing & Bill of Materials ................................ 2-3
Bunk Assembly Instructions .........................................3
Tongue & Safety Chain Dwg/BOM. .............................. 4-5
Safety Instructions ........................................................5
Tongue Assembly Instructions ......................................5
Safety Chain Assembly Instructions ............................. 5
Brake Line Installation Instructions ............................... 5
Chassis Drawing & Bill of Materials .............................. 8-9
Tire Size & Carrying Capacity Chart ............................. 9
Spring Assembly Instructions ....................................... 9
Axle Assembly Instructions ...........................................9
One Axle Brake Installation ..........................................9-10
Tire & Wheel Assembly ................................................10
Trailer Adjustments .......................................................10
Axle Adjustments ..........................................................10
Rear Support System ...................................................10
Bunks ...........................................................................10
Front Bunk Support ......................................................10
Winch Post Adjustments ...............................................10
800.859.3028
www.shorelandr.com
Page
0003441

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SLB34BLW and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ShoreLand'r SLB34BLW

  • Page 1: Table Of Contents

    ® SLB34BLW SLB34BLW Bundles Required: Table of Contents: Page 4300269 ST205/75R15D Denman Tire/TS Dir Rim ... 2 Frame Drawing & Bill of Materials ........ 2-3 (or) Bunk Assembly Instructions .........3 4300268 ST205/75R15D Denman Tire/Galv Dir Rim . 2 Tongue & Safety Chain Dwg/BOM....... 4-5 68224 Brake Box w/Hardware ........
  • Page 2: Frame Drawing & Bill Of Materials

    Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003441 Page 2...
  • Page 3: Bunk Assembly Instructions

    FINAL ASSEMBLY INSTRUCTIONS Remove the hardware bag from the frame, remove parts and sort by size. B-SERIES BUNK ASSEMBLY Locate the two 2 x 6 bunk assemblies. Note that the bunk mounting brackets are assembled to the bunks at the fac- tory.
  • Page 4: Tongue & Safety Chain Dwg/Bom

    Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003441 Page 4...
  • Page 5: Safety Instructions

    TONGUE The tongue is shipped separate of the frame. Locate the appropriate tongue and install by sliding it in the front of the tongue channel. Line the holes in the tongue with the holes in the tongue channel. Install the 1/2” x 4” hex bolt in the front cross hole and secure with a 1/2”...
  • Page 6: Profile 2000 Winch Dwg/Bom/Assy Instr

    Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003441 Page 6...
  • Page 7 WINCH POST ASSEMBLY The height that the bow eye is placed in your boat will determine the length of winch post required. Once this is deter- mined, attach the winch base to the tongue with three 1/2” x 4” carriage bolts and lock nuts.
  • Page 8: Chassis Drawing & Bill Of Materials

    Diagram D Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003441 Page 8...
  • Page 9: Tire Size & Carrying Capacity Chart

    Tire Size and Carrying Capacity Chart Tire Size ....... ST205/75R 15-D GVWR ......4240 lb. Carrying Capacity ..3400 lb. Axle ......Disc Brakes Refer to the tire side wall for correct tire pressure. SPRINGS Position the axle so it is properly aligned with the trailer and the brake calipers are located on the back side of the axle.
  • Page 10: Tire & Wheel Assembly

    Remove the plastic cap from the end of the frame brake line frame. Reposition the rear pivot arm into the other hole posi- coming out of the side frame. tion predrilled in the side frame. Uncoil the brake line so that it reaches the end of the hose Reattach the rear pivot to the side frame with the bolts just just attached to the brake line clip bracket.

Table of Contents