W
iring diagram
Fig. 20
Put noise suppressor into the space
between strain relief and main switch.
Fig. 21
A. Field Lead Wire (black) to Brake Switch
Route it between rib A and rib B.
B. Field Lead Wire (white) to main switch
Route it between rib C and rib D.
Route these lead wires between rib F and rib G, and then
put them into lead wire holders.
B. Field Lead Wire (white)
Connecting lead wire (orange)
(to main switch)
Lead wire holder
Lead Wire Holder
Power Supply Cord
Noise Suppressor
Strain Relief
A. Field Lead Wire (black)
Rib F
Rib G
Rib A
Rib B
Rib C
Rib D
Handle Section
Main Switch
Motor Section
The recectaples have to face the wall of
housing set (L).
Wall of
housing set (L)
Lead wire holder
Rib E
Field
to Brake switch
to Field
Top View of Bake Switch
Recectaples
Brake switch
P 10 /10