Belshaw Brothers 718LCG Operator's Manual

Belshaw gas fryer operator's manual models 718lcg, 724cg, and 734cg
Hide thumbs Also See for 718LCG:

Advertisement

Gas
Fryer
Models
718LCG,
724CG,
and
734CG
Operator's
Manual
Serial # W 06060001 - on
If you accept the machine from the shipping
company, you are, in effect, saying that the
machine is in good condition, and you must
pay for the machine. Belshaw cannot pay for
shipping damage, because the freight company
has accepted the machine from Belshaw in good
condition, and is responsible for its safe delivery.
For your protection, inspect the machine to see
that no parts are bent, scratched, or otherwise
damaged. If any damage has occurred in
shipping, file a freight claim with the shipping
company immediately.
IMPORTANT
Keep this manual for future reference.
To unpack the fryer and transport it to the
workstation:
1.
Use a fork lift to transport the shipping crate
to the work station.
2.
Break down the shipping crate.
3.
Remove all the packing materials from the
fryer. These include foam, tape, brown
paper, plastic, and white protective coating.
4.
Position the fryer to allow sufficient space
on either end of the machine for any
equipment you plan to use with it.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 718LCG and is the answer not in the manual?

Questions and answers

Summary of Contents for Belshaw Brothers 718LCG

  • Page 1 IMPORTANT Keep this manual for future reference. To unpack the fryer and transport it to the workstation: Use a fork lift to transport the shipping crate to the work station.
  • Page 2 EQUIPMENT RECORD Please provide the information below when you correspond with us about your machine. Purchased by _____________________________________________________________________ Installed by ______________________________________________________________________ Date of Installation ________________________________________________________________ Model number ____________________________________________________________________ Serial number 0606 MN-1141EN Belshaw Bros., Inc. 1750 22nd Avenue South Seattle, WA 98144-4590 USA Phone: (206) 322-5474 •...
  • Page 3: Table Of Contents

    Removing the Shortening Washing Rinsing Maintenance Troubleshooting Appendixes Pilot Module Checkout Troubleshooting—General Troubleshooting the Ignition System Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 Contents MN-1141EN...
  • Page 4: Limited Warranty

    Donut-Making Helps Tips on Making Quality Cake Donuts Calculating Correct Water Temperature Ratios of Plunger Sizes to Donut Weights Temperature Conversion Parts Lists Limited Warranty Insert...
  • Page 5 Preface The 718LCG, 724CG, and 734CG Gas Fryers are designed to fry cake and yeast-raised donut products. Each must be bolted to a flat, dry floor. The operator should stand opposite the flue stack. The operator must work safely at all times and read this manual and follow its instructions and warnings.
  • Page 6 Contact Belshaw Brothers at 1-800-578- 2547 to obtain necessary parts and instructions.
  • Page 7: Installation

    1/2 psig (3.45 kPa). Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers • The fryer must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any...
  • Page 8: Unpacking The Fryer

    Fasten the heat shield to the splash shield Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers stack underneath the retaining strip on the flue base. The mounting holes must line up.
  • Page 9: Installing The Fryer

    Set the fryer cabinet on a flat, dry floor. Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers Level the fryer. Follow these steps: a. Check to see if the fryer is level. To do b.
  • Page 10: Moving The Fryer

    “Installing the Fryer” above. Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers WARNING serious burns. WARNING WARNING serious injury or loss of life.
  • Page 11: Operation

    If you are frying yeast-raised donuts, install the proofer or feed table. Refer to the Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers proofer or feed table manual for complete installation and operation instructions. Make sure the drain valve is closed.
  • Page 12 Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers to melt shortening and transfer it to the kettle. See the FM manual. and pour it into the kettle.
  • Page 13 12. When you are done frying donuts, move the on/off switch to the OFF position. Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 MN-1141EN...
  • Page 14: Cleaning

    Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers Cleaning WARNING before cleaning it.
  • Page 15: Washing

    Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers Connect the fryer to the power source. Move the on/off switch to ON. Set the temperature control to 200°F/93°C.
  • Page 16: Rinsing

    Dry the kettle and burner tubes thoroughly. Dry the fryer thoroughly. Moisture causes hot shortening to spatter, which may cause Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers WARNING floor. WARNING burned.
  • Page 17: Maintenance

    A reset key used to return to normal operation mode. Figure 1 – Operator Interface Description Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 MN-1141EN...
  • Page 18 Figure 2 - Menu Flow Chart Belshaw Bros., Inc. • 1750 22 Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 MN-1141EN 718LCG, 724CG, and 734CG Gas Fryers...
  • Page 19 Then adjust SP1H, PB, OUT2 and the LocK parameters as listed in Belshaw “Factory” below. Then set SP1 to 375ºF. Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers for 3 seconds, this will take you to the “SEt” menu. once to access the “LocK” parameter.
  • Page 20 Table 1 - Parameter Descriptions Belshaw Bros., Inc. • 1750 22 MN-1141EN Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers Set to 375ºF set to “uSEr” after setup 0ºF 410ºF...
  • Page 21 Table 2 - Parameter Descriptions Set to “nonE” Belshaw Bros., Inc. • 1750 22 Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers MN-1141EN...
  • Page 22 Table 3 - Parameter Descriptions Set to Belshaw Bros., Inc. • 1750 22 Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 MN-1141EN 718LCG, 724CG, and 734CG Gas Fryers...
  • Page 23: Troubleshooting

    Bros., you do so at your own risk. WARNING Disconnect the machine from the power source before disassembling, repairing, or wiring. Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers Troubleshooting Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 MN-1141EN...
  • Page 25: Checkout

    This appendix contains supplemental information about the Honeywell S8600 Intermittent Pilot Module. The Belshaw 718LCG, 724CG, and 734CG gas fryers all use this module. Fryers using natural gas use the S8600F-1000. Fryers using propane use the S8600H-1014. Belshaw provides this appendix as a courtesy to our customers.
  • Page 26: Step 3: Reset The Module

    Set the fryer’s thermostat below 200°F/93°C and wait at least one minute before continuing. Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers...
  • Page 27 Pilot flame fails. Main valve closes. Figure A-1. Normal Operating Sequence. Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers Thermostat calls for heat. First main valve opens. Gas flows to pilot burner. Igniter-sensor sparks. Pilot burner does not light, or module does not sense flame current.
  • Page 28: Troubleshooting-General

    Nuisance shutdowns are often caused by a poor or erratic ground. Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers thermostat below 200°F/93°C for at least one minute before continuing. On retry models, wait for retry or reset at the thermostat.
  • Page 29: Step 3: Check Spark Ignition Circuit

    SPARK terminal until a spark is established. Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers Pull the jumper slowly away from the terminal and note the length of the gap when sparking stops.
  • Page 30 Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers If the main burner does not light, check for 24V AC across MV-MV/PV terminals. If there is no voltage, replace the module.
  • Page 31: Tips On Making Quality Cake Donuts

    The donuts may also become dense inside. Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers Donut-Making Helps If the shortening is too cold, the donuts will spread too rapidly, will form large rings, will...
  • Page 32: Calculating Correct Water Temperature

    Fahrenheit, multiply °C by 1.8 and add 32 to the result. For example, (100°C x 1.8) + 32 = 212°F. °F Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers Yeast-Raised Donuts °C °F 22.2...
  • Page 33: C Parts Lists

    Parts Lists The following pages contain lists of the parts that make up the 718LCG, 724CG, and 734CG Gas Fryers. Each parts list refers to an exploded- view assembly drawing. You can use the parts lists and assembly drawings to order replacement parts. When you do, please provide electrical information about your fryer.
  • Page 34 724G- 0147-52 724G-0152 724G-0152 724G-0156 724G-0170 724G-0182 Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers DESCRIPTION-TRUNC. KETTLE BACK SPLASH DRAIN TRAY FLUE BOX ASSEMBLY MANIFOLD PIPE ASSEMB CARRYOVER TUBE ASSEM...
  • Page 35 SWITCH PLATE FUSEHOLDER 15 DR42-0066 AMP/2 EP18/24- 0140 LABEL- BELSHAW FM200- BUSS FUSE-TYPE MDA 0080A Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers 718LCG PARTS LIST (CONT’D) ITEM NUMBER FM200- 0102 FT100- 0063 H-0024 MDD-0459 P-0001...
  • Page 36 FM200-0102 MDD-0459 P-0001 P-0002 U-0008 Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 718LCG, 724CG, and 734CG Gas Fryers DESCRIPTION-TRUNC. 2" PLUG BUTTON 3/8" HOLE PLUG WHITE LP GAS CONVERSION AIR SHUTTER ORIFICE .011 LP PILOT...
  • Page 37 724G-0205 PILOT LIGHT RED 25V 724G-0206 2" PLUG BUTTON, NICK 724G-0207 3/8" HOLE PLUG WHITE ITEM DESCRIPTION-TRUNC. Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers 734CG PARTS LIST. NUMBER 724G-0239 724G-0242 724G-0269N 724G-0273 724G-0299 724G-0312 724G-0313...
  • Page 38 0080A Belshaw Bros., Inc. • 1750 22 Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 MN-1141EN 718LCG, 724CG, and 734CG Gas Fryers...
  • Page 39 P-0002 MOUNT RF-0012 KNOB TEMP CONTROL,1/16 TJ-0184 DIAG U-0008 DIAL SCREW COLLAR Belshaw Bros., Inc. • 1750 22 718LCG, 724CG, and 734CG Gas Fryers 734FG PARTS LIST Ave. S. • Seattle, WA 98144 • Phone 206-322-5474 • Fax 206-322-5425 MN-1141EN...
  • Page 41 US/Canada/Mexico Limited Warranty and Return Policy Belshaw Brothers Inc. warrants parts of its manufacture and assembly of equipment to be free from defects in workmanship and material which would result in product failure under normal use and service. Belshaw’s entire liability under this Warranty is limited to either repairing or replacing at its factory or;...
  • Page 42 No RGA# will be issued if the item in question was invoiced anytime prior to 180 days of the request Following these guidelines will help expedite the processing of your return. Belshaw Brothers Inc. 1750 22 Avenue S. Seattle, WA 98144-4590...

This manual is also suitable for:

724cgAnd 734cg734cg

Table of Contents

Save PDF