Page 2
1. Prepare A Level Concrete Foundation Prepare a level concrete foundation for mounting the Jet Monoblock and tighten the motor base using the foundation bolts as shown in Fig. 1(a) to (d). For Bore Mounted Type Vertical Jet Monoblock (TSJ Series), mount the set on the bore casing pipe shown in Fig.
Page 3
HORIZONTAL JET MONOBLOC - TDSJ SERIES DELIVERY PIPE PRESSURE VALVE MOUNT 1/8'' BSP PRESSURE GAUGE HERE FILLING PLUG CONCRETE BASE FOUNDATION BOLT & NUT BORE WELL JET UNIT FOOT VALVE...
Page 4
SHALLOW WELL JET MONOBLOC - HCS SJ SERIES DELIVERY PIPE BALL VALVE PRIMING PIPE SUCTION PIPE FOUNDATION BOLT & NUT STRAINER 0.5m...
Page 5
VERTICAL JET MONOBLOC - HCSJ 40 / 70 / 90 SERIES DELIVERY PIPE FILLING PLUG PRESSURE VALVE FOUNDATION BOLT & NUT SIDE VIEW BORE WELL BORE WELL JET UNIT FOOT VALVE...
Page 7
2. Use Prescribed Pipe Sizes As Mentioned On The Product Name Plate 2. It is essential to ensure the motor has an adequate degree of protection from dust, fumes and water. Ensure that the motor has no obstruction around it as this can reduce the free circulation of cooling air. 3.
PRESSURE VALVE ASSEMBLY PRESSURE VALVE WITH PRESSURE PIPE PORT Fig. 2(A) Pressure Valve – For HCSJ 40/70/90, TSJ, TDSJ Series Fig. 2(B) Pressure Valve With Pressure Pipe Port – For HCSJ 80 / 11 Series 6. Electrical Installation • Ground the Single Phase Jet Monoblock. •...