John Lewis JLRC922 Connection Manual

John Lewis JLRC922 Connection Manual

Delivery and connection procedure

Advertisement

JOHN LEWIS COOKERS

DELIVERY AND CONNECTION PROCEDURE

Disposal and installation is not available online for this product. Instead, call 0345 604 8835 to order
over the phone and arrange these services.
John Lewis can provide a 'hook up' service to connect your new cooker to both the natural gas and/ or
electrical supply (please note we will not undertake disconnection or connection to LPG). This connection
service is provided on the understanding that existing fuel supplies have been prepared to a required
standard and fall within the parameters laid out in following information.
Once your order has been processed logistics will get in touch with you to arrange a home delivery
booking. When a date is agreed they will also give you a follow up call the day before delivery to
update you with a 4hr window. You can also choose to have a call one hour prior to delivery on the
actual day, should you wish.
To ensure everything runs smoothly, when making the booking our logistics team will carry out a home
delivery questionnaire to ascertain all information relating to both access at your property & the electrical
/ gas supply. You will be contacted separately by Smeg Service to arrange connection, please note this
service will usually take place on the next working day following your delivery.
DISCONNECTION: Please note our team can only disconnect gas from a standard bayonet tting.
Please ensure any cooker for removal is cooled down prior to team arriving.
GAS CONNECTION: Your cooker will be supplied with a one metre long mark 2 BS Bayonet Hose
with a 1/2" BSP male tting. When the engineer attends they will use this to connect your cooker to the
gas supply.
ELECTRICAL CONNECTION: Please visit www.johnlewis.com for information on the electrical loading
requirement for your appliance. Your cooker will be supplied with the appropriate cable to connect to
the electrical supply.
IMPORTANT
Please note this is a delivery, disposal and connection service only. The engineer will only connect
the gas and electric supply. All pipe and cable supply work must be in place prior to connection,
any remedial work required will not be undertaken and the engineer will not be able to complete
connection. You may be charged for any return visit the engineer is required to make. Please ensure
you refer to the attached connection guide speci c to your model.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the JLRC922 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for John Lewis JLRC922

  • Page 1 John Lewis can provide a ‘hook up’ service to connect your new cooker to both the natural gas and/ or electrical supply (please note we will not undertake disconnection or connection to LPG). This connection service is provided on the understanding that existing fuel supplies have been prepared to a required standard and fall within the parameters laid out in following information.
  • Page 2 JOHN LEWIS RANGE COOKER MODELS JLRC922 / JLRC921/JLRC917/JLRC918 The gas Bayonet tting must terminate to the left hand side of the cooker when viewed from the rear and must be within 100mm from the edge of left hand side, it must not be directly behind the appliance.

This manual is also suitable for:

Jlrc921Jlrc917Jlrc918

Table of Contents