Installing Additional Equipment - SMC Networks SMC7724M/VSW Installation Manual

Tigeraccess extended ethernet system
Hide thumbs Also See for SMC7724M/VSW:
Table of Contents

Advertisement

Installing Additional Equipment

The EE Switch and Splitter should be installed close to the PBX,
punch-down blocks, and patch panels, usually in the basement or wiring
closet. You may also want to install a rack for all the distribution
equipment (splitters, switches, routers etc.), and extra punch-down blocks
or patch panels for flexibility and future applications or expansion.
The splitter connects between the PBX and the punch-down block that
distributes the VDSL lines running up to the end users. An optional patch
panel can also be used between the splitter and the PBX. A cable with an
RJ-21 on one end and free wiring on the other end must be used to
connect between the splitter and the punch-down block. See "Connecting
RJ-21 Cables" on page 4-2 for further information.
Note: The analog or digital cards in the PBX servicing the EE splitters
must be activated prior to connection.
Punch-Down Blocks
Connecting to Clients
Figure 3-2. Wiring after EE Switch and Splitter Installation
Existing Phone
Lines to Clients
Splitters
Line
VDSL Splitter -VM2524
VDSL Splitter -VM2524
Line
VDSL Splitter -VM2524
VDSL Splitter -VM2524
P
Upper Floors
Basement
T ig er S w it ch 10 /1 0 0
T ig er S w it ch 10 /1 0 0
6 7 2 4 L 3
6 7 2 4 L 3
VM2524
T ig er S w it ch 10 /1 0 0
T ig er S w it ch 10 /1 0 0
6 7 2 4 L 3
6 7 2 4 L 3
VM2524
MPOE
PBX
S
REPARING THE
Telephone Line
from Central Office
ITE
3-3

Advertisement

Table of Contents
loading

Table of Contents