Appendix B: Submittal Drawings
The submittal drawings are in the order of document part number (DPN). Table B.1 below, groups the
drawings by topic/application.
Table B.1 Submittal-drawings Contents
Document Number
PFD Component Location
DPN004180
PFD Planning Dimensions
DPN004058
DPN004063
DPN004066
PFD Piping Schematics
DPN004060
DPN004062
PFD Piping Connections
DPN004059
DPN004064
PFD Electrical Connections
DPN004168
DPN004169
Title
PFD Condensing Unit, 3-, 4-, and 5-ton
Cabinet dimensions, 5-ton, top discharge
Cabinet dimensions, 3-, 4-, and 5-ton, horizontal discharge
Optional anchoring plan, 3-, 4-, and 5-ton, horizontal discharge
Piping arrangement, 3-, 4- and 5-ton split-system
Piping arrangement, Condensing unit
Primary connection locations, top discharge
Primary connection locations, horizontal discharge
Electrical Field Connections, top discharge
Electrical Field Connections, horizontal discharge
35