Set Up And Location; Nspect The Iln; Ssemble The Iln Omponents; Prime The Shelves And Kiln Floor - Skutt Klin Operation Manual

Glass fusing kiln
Table of Contents

Advertisement

B
6
EFORE

Set Up and Location

I
K
NSPECT THE
ILN
Carefully remove the kiln and accessories from the Hot Start Kiln box. The box should include the following if
purchased with an accessory kit.
Hot Start Kiln
8 oz. (.25kg) Kiln Wash*
3 - 1" (2.5cm) Posts*
*Included when HotStart is purchased with Accessory Kit.
Remove the kiln and other components from the box and inspect them for any damage that may have occurred
during shipping. If you notice any damage call the HotStart Dealer where you purchased the kiln for information on
how to fi le a freight claim.
Vacuum the inside of the kiln to remove any dust that accumulated during shipment. It is particularly important to
vacuum the grooves in the lid that hold the elements.
A
K
SSEMBLE THE
ILN
Align the two halves of the kiln stand and attach them together using the screws, nuts, and lock washers supplied.
Place the black plastic stand feet on the stand legs. Place the kiln on top of the stand making sure it is centered. At-
tach the lid brace to the lid using the thumbscrew which is shipped screwed into the left side of the lid. Lastly insert the
porcelain viewing plug into the side of the kiln.
P
T
S
RIME
HE
HELVES AND
You will want to apply a shelf primer, also referred to as kiln wash, on your shelves and kiln fl oor. This will
protect them from melted glass adhering to their surfaces. There are a number of different formulations with different
instructions for application, so be sure to follow the directions of the brand you choose. If you purchased the accessory
kit with your HotStart kiln it will include an 8 ounce bag of kiln wash.
Add 6 tablespoons of kiln wash powder to 1 cup (250 ml) of water and mix it thoroughly. Apply several coats
with a fi ne bristled paint brush to both the top of the kiln fl oor and the top of the kiln shelf. Four coats applied in oppo-
site directions should be suffi cient. Allow to dry for several minutes between coats. When you are fi nished allow them
to dry completely before using. When they are completely dry they will have a uniform white appearance. Never kiln
wash the walls or lid of your kiln!
It is a good idea to fi re the shelf up to around 500 °F (260
°C) to ensure that all of the moisture from the kiln wash has
dissipated. If glass is placed on top of wet kiln wash and fi red,
the residual moisture escapes in the form of gas and can cause
bubbles in your glass. For instructions on how to program the
kiln to pre-fi re the coated shelf consult the "Ramp and Hold"
section of this manual.
Y
S
OU
TART
2 Stand Halves
4 Stand Feet
Stand Hardware Pkg.
C
OMPONENTS
K
F
ILN
LOOR
Operating Manual
Lid Brace
13" (33cm) Shelf*
Fiber Shelf Paper (rolled)*
Warranty Card
Peep Plug

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hotstart pro

Table of Contents