UNPACK TILLER AND ASSEMBLE
INSTALL DEPTH REGULATOR LEVER
FILL ENGINE CRANKCASE
mix oil with gasoline.
Do not overfi ll.
Do not
IMPORTANT
THE RIGHT AND LEFT SIDES OF YOUR
ROTOTILLER ARE DETERMINED FROM
THE OPERATING POSITION AS YOU
FACE THE DIRECTION OF FORWARD
TRAVEL.
ENGINE IS SHIPPED FROM FACTORY
WITHOUT OIL. YOU MUST ADD ENGINE
OIL BEFORE STARTING ENGINE.
CAUTION
DO NOT TRY TO LIFT THE ROTOTILLER FROM THE
CARTON.
NARROW TINE WIDTH
WIDE TINE WIDTH