Flammability: Keep all storage and work Inhaled: Leave the dusty area. areas well ventilated to avoid a buildup of dust that could ignite. Resco StormCube WW version. Step-by-step Installation Guide. January 2018...
Page 3
Finger prints and other such surface marks can be neutralised with a silicone spray and a micro-fibre cloth. See our Web site: www.resco.co.nz/product/multicom - Cleaning instructions For removal of graffiti – Please call our customer service team 0800 800 950 Resco StormCube WW version. Step-by-step Installation Guide. January 2018...
• Rivet tool • 3.5 mm drill bit • 5 mm Masonry bit • No. 1 Square drive • No. 2 Pozi-drive • Drop saw • Nylon hammer • Circular saw Resco StormCube WW version. Step-by-step Installation Guide. January 2018...
Page 5
Step From the ‘Resco Shop Drawings’, mark the division centres on the back wall. a. Check location of toilets and ensure centered (these are sometimes fitted differently to the plans). Resco StormCube WW version. Step-by-step Installation Guide. January 2018...
Page 6
Just ensure you remark the chalk line and that it’s straight, fits and looks good. Resco StormCube WW version. Step-by-step Installation Guide. January 2018...
Page 7
3.5mm drill bit in wood floor or a diamond drill bit for tiles. Place (F) plastic anchor in hole. Secure floor block, using (A) 8gax32 screws. Floor mount brackets located in position. (Indicative only. Not to scale.) Resco StormCube WW version. Step-by-step Installation Guide. January 2018...
Page 8
Clip ½ Stile bead in place. Use Silicone to hold in place. Place the right hand side end fascia into position onto blocks – just hold it in position for now. 13mm Aluminium bead in position Resco StormCube WW version. Step-by-step Installation Guide. January 2018...
Page 9
Make sure it sits on the floor with the Stile mounted over the floor bracket. (Not to scale). Full Stiles located in position over the floor mount brackets. (Indicative only. Not to scale.) Resco StormCube WW version. Step-by-step Installation Guide. January 2018...
Page 10
Step Place the next full stile into position and fix in place. Insert pocket infils Check the ‘Resco shop drawings’ to ensure that the full Fix Fascia panels in place, screw fix Headrail into the top stile is orientated correctly.
Page 12
Product: Product Code: Resco StormCube StormCube-R Installation Guide Return version. January 2018 Step-by-step Installation Guide RETURN VERSION (Only 1 side wall) JANUARY 2018 Job# 5252 Resco StormCube-R version. Step-by-step Installation Guide. January 2018...
Page 13
For cuts, clean worn when machining. wound and apply antiseptic dressing. Flammability: Keep all storage and work Inhaled: Leave the dusty area. areas well ventilated to avoid a buildup of dust that could ignite. Resco StormCube-R version. Step-by-step Installation Guide. January 2018...
Page 14
Finger prints and other such surface marks can be neutralised with a silicone spray and a micro-fibre cloth. See our Web site: www.resco.co.nz/product/multicom - Cleaning instructions For removal of graffiti – Please call our customer service team 0800 800 950 Resco StormCube-R version. Step-by-step Installation Guide. January 2018...
Page 15
• Timber wedges • Rivet tool • 3.5 mm drill bit • 5 mm Masonry bit • No. 1 Square drive • No. 2 Pozi-drive • Drop saw • Nylon hammer • Circular saw Resco StormCube-R version. Step-by-step Installation Guide. January 2018...
Page 16
RETURN VERSION Step Step From the ‘Resco Shop Drawings’ mark the distance from Fix back U-Channels (1748mm) centered on your marks, 52mm below the Datum line. the back wall to the front of the cubicles. a. The U-Channels are predrilled.
Page 17
Plumb and Fix in place at ½ Stile. Counter sink screws through panel into ½ Stile. b. Clip ½ Stile bead in place. Use Silicone to hold in place. 13mm CONTINUED NEXT PAGE Resco StormCube-R version. Step-by-step Installation Guide. January 2018...
Page 18
Just ensure you remark the chalk line and that it’s straight, fits and looks good. Resco StormCube-R version. Step-by-step Installation Guide. January 2018...
Page 19
Trim all Stiles to height, by putting each Stile upside down over the appropriate floor mount, mark and Use 3.5mm drill bit with (D) Stainless Steel then trim. Pop Rivets. Floor mount brackets located in position. (Indicative only. Not to scale.) Resco StormCube-R version. Step-by-step Installation Guide. January 2018...
Page 20
(Not to scale). Fix losely Place the next Stile into position and fix in place. Check the ‘Resco shop drawings’ to ensure that the Stile is orientated correctly. Insert appropriate Fascia and align U-Channel with corresponding division panel.
Page 21
Use a 3.5mm drill and fix with (E) 8GA x 20 counter sunk screws. Place pocket-infills to fill pockets between the finished floor and the bottom of the panels. These may need trimming if Stiles have been shortened. Clip into place. Resco StormCube-R version. Step-by-step Installation Guide. January 2018...
Need help?
Do you have a question about the StormCube and is the answer not in the manual?
Questions and answers