Download Print this page

Advertisement

Quick Links

Quantum UC1000

Installation Guide

UC1000 / 4000
Premium Quality
Drinking Water System

Advertisement

loading
Need help?

Need help?

Do you have a question about the UC1000 and is the answer not in the manual?

Questions and answers

Summary of Contents for Quantum UC1000

  • Page 1: Installation Guide

    Quantum UC1000 Installation Guide UC1000 / 4000 Premium Quality Drinking Water System...
  • Page 2 Relieve line pressure by opening the cold water tap for a few seconds until water stops; then close the tap. Select a suitable location to mount (B) Quantum Head and (A) Cartridge, leaving approximately 2” of space below cartridge for ease of future cartridge changes.
  • Page 3 Angle Stop Valve to return water service to kitchen sink. Check for leaks. Measure length of tubing needed to connect (H) Angle Stop Adaptor to (E) Inlet Fitting on (B) Quantum Head. Allow adequate tubing to avoid sharp turns. Fig. 3 Fig.
  • Page 4 Make sure the cut is flush or a leak may form. Insert one end of tubing into (F) Faucet Connector. (Fig. 8) Insert other end of tubing into (D) Outlet of (B) Quantum Fig. 8 Fig. 9 Head. (Fig. 9) Installing Filter Cartridge Remove plastic wrapping from new (A) Q1000 Filter Cartridge.

This manual is also suitable for:

Uc4000