Page 1
INSTALLATION MODEL ULTRA-TEMP INSTRUCTIONS & (5 to 8 inches dia.) MAINTENANCE GUIDE FACTORY-BUILT INSULATED CHIMNEY (Canada Only) A MAJOR CAUSE OF CHIMNEY-RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR SPACES) TO COMBUSTIBLE MATERIALS IT IS OF THE UTMOST IMPORTANCE THAT THIS...
Model UT chimney is listed for use with Selkirk fireplace models. NOTE: The ideal location for your chimney system is within the building envelope. In cold climates, the use of external chimneys...
- Roof Flashing: Required when the chimney penetrates a roof. FIGURE 1 - 15° , 30° or 45° Elbow Kits (2 per box with locking bands and elbow support). - Suitable lengths of chimney: Available in 6”, 12”, 18”, 24” and 2 ft.
Warning: The chimney lengths and its fittings must be assembled - Together with a fully framed opening (all four sides) it controls vertical and horizontal spread of any fire external to the chimney. with metal-to-metal joints as furnished. Do not use tape or any - It stabilizes the chimney in the framed opening and defines and sealing compound (such as tar, mastic, putty or silicone) at the maintains the required two inch AIR SPACE clearance to combustibles.
ELBOW INSTALLATION One pair only of (two) 15 or 30 or 45 degree elbows may be used Elbow Kits (2 elbows, 1 offset support and 4 locking bands). to provide an offset in order to avoid cutting of joists and to clear other obstructions.
Page 7
To complete a proper Wall Support installation, the following parts may be required: -Adjustable Wall Support: Intended for a through-the-wall installation where the chimney has a horizontal connection. -Suitable Lengths of chimney: Installed above the support. -Through-The-Wall Length: Attaches to tee branch. -Insulated Tee w/Plug -Insulated Wall Thimble: Required to pass through a combustible wall.
Page 8
6. Ensure that the Wall Support is level, and secure to the wall through the pre-punched holes located on the sides of each of Telescoping adjustment Insulation from 6” to 11” Blanket the wall support brackets using (8) #14 x 1-1/2” hex head lag screws or #10 x 1-1/2”...
NOTE: Inverting the brackets (brackets mounted above the support suspend the chimney below the roof. To complete a proper plate) can be accomplished by inserting extra bolts through the Cathedral Ceiling Support installation, the folllowing parts may oblong slots of the support side brackets and the support plate be required: as per Figures 14 and 15.
position by tightening the support band with the bolt and nut. 3. Determine the chimney plate position on the chimney casing Secure the band to the chimney outer casing by screwing four (See Figure 19). stainless steel sheet metal screws through the support band 4.
Once you have marked and located the area where the chimney will come through the roof, center, position and prepare the roof area by removing shingles, shingle nails and cutting the roofing material. Frame a RECTANGULAR opening to suit the pitch of Round Top the roof and ensure that a 2”...
SPARK ARRESTER The band is clamped around the chimney and the two legs bolted to the roof. Position the band approximately two thirds of the way up the chimney height. The preferred location for the Use a spark arrester if you have a shingle roof or live in a for- band is next to a joint, immediately above or below a locking ested area.
MODEL UT ANCHOR PLATE CHIMNEY FIRES AND WHAT TO DO ABOUT THEM: Your Selkirk chimney is not intended or designed for use as a The Anchor Plate can be used for adapting the UT chimney to a “Listed” Factory-Built Fireplace certified for use with Model UT.
OFFSET CHART CHIMNEY INSTALLATION It may be necessary to offset the chimney in order to clear a joist or an obstacle. The three (3) charts below will assist you in selecting the proper combination of elbow angle and chimney length(s) that will provide the necessary degree of offset within an available height. OFFSET CHART 1.
CHART 2 - CHIMNEY HEIGHT ABOVE THE ROOF Requirement # 1 : The code requires that the chimney must extend at least 3 feet (900mm) above the highest point of the roof that it penetrates. Requirement # 2 : It must also be 2 feet (609mm) above any roof, wall or other obstruction within a horizontal distance of 10 feet (3m). The following Chart is to assist you in determining the minimum chimney height you will require above the roof.