Advertisement

INTERACTIVE
PLAYGROUND
ÜNO/DÜO CONFIGURATION
EN - Installation Instructions
Revision Sept 14th, 2018

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UNO and is the answer not in the manual?

Questions and answers

Summary of Contents for Lu UNO

  • Page 1 INTERACTIVE PLAYGROUND ÜNO/DÜO CONFIGURATION EN - Installation Instructions Revision Sept 14th, 2018...
  • Page 2: About This Guide

    About This Guide The Lü Interactive System Installation Manual has basic product information such as safety and operation. Disclaimer Thie information and specifications contained in this installation manual are subject to change without notice. Important Safety Instructions 1. Always connect the product to a grounded circuit 2.
  • Page 3 Installation methods, process, and safety are the supplier responsibility for the total lifetime of the product. For any additional questions or validations, please contact our installation coordination team at info@play-lu.com. INTERACTIVE PLAYGROUND...
  • Page 4: Product Components

    Product components Each ÜNO configuration consist of (3) ceiling mounted modules: Light & Sound Module 6x 200w LED PAR to manage the ambiant lighting and general colors, 2x Robotised LED light fixtures for special light effects and a powerful 2000 watts sound system.
  • Page 5: Installation Configuration

    Installation configuration ÜNO vs DÜO Lü can be sold in two different configurations. ÜNO is one interactive wall. DÜO is two interactive walls facing each other. DÜO is the equivalent to having two ÜNO configurations, with some minor tweaks to allow synced experiences using the full gymnasium INTERACTIVE PLAYGROUND...
  • Page 6: Technical Specifications

    Technical Specifications LIGHT & SOUND PROJECTOR CAMERA MODULE MODULE MODULE INSTALLATION 16’ from the wall / 18’ 18’ from the wall / 20’ 30’ from the wall / 18’ POSITION* high high high SIZE 12’’ L x 12’’ L x 8’’ H 33’’...
  • Page 7: Top View

    Installation configuration Top view All units are to be ceiling mounted, aligned on the projection surface like the diagram below. Some exceptions for special environments can be made, please contact us for more options. Projection surface Max: 19’ Large (5.8m) - 10’ High (3.3m) Camera Module Install at 18’...
  • Page 8: Side View

    Installation configuration Side view All units are to be ceiling mounted, aligned on the projection surface like the diagram below. Some exceptions for special environments can be made, please contact us for more options. D: 30’ (9.1m) D: 18’ (5.5m) D: 16’...
  • Page 9: Installation - Rigging

    Installation - Rigging Light Module Mount unit with side ‘’A’’ facing toward the interactive projection wall. To be ceiling mounted using the 4 rig points located on the main frame. Size of holes: 1/2’’ (15mm) 45 inches Lifting Eyebolts To facilitate lifting using a hoister from floor to ceiling, we included two eyebolt centred on the unit.
  • Page 10 Installation - Rigging Projection Module To be ceiling mounted using a pole with 1 1/2-11.5 NPS THREADED FITTING INTERACTIVE PLAYGROUND...
  • Page 11 Installation - Rigging Camera Module To be ceiling mounted using a pole with 1 1/2-11.5 NPS THREADED FITTING INTERACTIVE PLAYGROUND...
  • Page 12: Operation

    Operation ÜNO - Connection diagram Connect modules 1, 2 and 3 following this diagram with provided cables HDMI from USB3 from NUC PC to camera to projector NUC PC Wired internet connection from NUC PC to ceiling mounted network outlet Power to Power to Power to...
  • Page 13 Operation DÜO - Connection diagram 1. Connect modules 1, 2 and 3 using the ÜNO connection diagram 2. Inter-connect the two light modules together following this diagram ETHERNET ETHERNET Ethernet cable from D1 NUC PC to ceiling Ethernet cable from D2 NUC PC to ceiling outlet provided by customer* outlet provided by customer* DMX output #2 from DATA...
  • Page 14 Operation DÜO with extra lighting unit - Connection diagram 1. Connect modules 1, 2 and 3 using the ÜNO connection diagram 2. Inter-connect the two light modules together following this diagram ETHERNET ETHERNET Ethernet cable from D1 NUC PC to ceiling Ethernet cable from D2 NUC PC to ceiling outlet provided by customer* outlet provided by customer*...
  • Page 15 Operation Site and screen preparation Mark the (4) corners of your projection location on the wall Ideal position is to set the bottom of the screen at 1 feet (30cm) from the floor. Maximum Width of 19’ (5,8m), height of 10,68 feet (3,25m). ***Always respect a ratio of 16:9 for your screen.
  • Page 16 Operation System Calibration When all components are rigged, and connected, you are ready for calibration. Camera calibration In the Lü main menu, hit the gear shortcut in the main menu and enter camera calibration. On the purple background interface, hit the ‘’V’’ key on the keyboard to display the camera feed from the kinect, and adjust camera position to center the projection area in the RGB field of view from the camera.
  • Page 17 Operation Camera Calibration Calibration will adjust the camera used to detect balls on the wall. Once the system is calibrated, it is not necessary to repeat the operation each time. The system should only be calibrated when you feel that the contact between the ball and the wall is not accurate. To calibrate the system, follow the steps below: A.
  • Page 18 Installation exemples INTERACTIVE PLAYGROUND...
  • Page 19: Contact Informations

    DMX Distribution - Chauvet Data Stream 4 https://www.chauvetdj.com/wp-content/uploads/2015/12/ Data_Stream_4_UM_Rev2_WO-1.pdf Wireless microphone - Shure BLX14R http://pubs.shure.com/guide/BLX4R/en-US Contact informations For support, any questions or comment on this product: +1 418 781-0797 support@play-lu.com 202-707 St-Vallier E. St Quebec, QC, Canada G1K 3P9 INTERACTIVE PLAYGROUND...

This manual is also suitable for:

Duo

Table of Contents