Power Sentry QD MVOLT Series Installation Instructions Manual

Power Sentry QD MVOLT Series Installation Instructions Manual

Emergency fluorescent battery pack universal voltage 120 to 277vac input

Advertisement

PS 300 MVOLT, PSQ500 MVOLT, PS600 MVOLT, PS1400 MVOLT
READ AND FOLLOW THESE INSTRUCTIONS BEFORE INSTALLATION TO INSURE PROPER AND SAFE
FIELD INSTALLABLE FLUORESCENT BATTERY PACK IS UNIVERSALLY COMPATIBLE WITH THE BALLASTS
AND LAMP(S) AS SHOWN IN LAMP COMPATIBILITY TABLE (PAGE 5)
READ AND FOLLOW ALL
SAFETY INSTRUCTIONS
WARNING
Dual Power Supply - Risk of Shock Hazard Even
if AC Power is OFF
Disconnect polarized Test Switch / Pilot Light
connector before servicing fixture
DO NOT remove the wire harness connector
when AC Power is ON
DO NOT mount near a gas or electric heater
Battery Pack Output Voltage is 1600VDC
CAUTION
 Before wiring to power supply, turn off
Electricity at fuse panel or circuit
breaker
 All servicing shall be performed by
qualified personnel
 DO NOT attempt to service the battery.
It is not field replaceable
 DO NOT use in hazardous locations
 DO NOT use this product outdoors
DO NOT use this product in air handler
heated outlets
 DO NOT use accessory equipment not
recommended by the manufacture
 DO NOT use this equipment for other
than its intended use
Installation INSTRUCTIONS
EMERGENCY FLUORESCENT BATTERY PACK
Universal Voltage 120 to 277VAC Input
SAVE THESE INSTRUCTIONS
QD MODELS
OPERATION

IMPORTANT SAFEGUARDS

Consult your local building code for approved
wiring or installation
The emergency battery pack must be connected
to an un-switched AC power source of 120 to 277
Vac
This product is for use with indoor fixtures sealed
or unsealed
Equipment should be mounted in a location and
at heights where it will not be readily be subject to
tampering by unauthorized personnel
Make sure that the branch circuits are derived
from a common phase for both normal lighting
ballast and Battery Pack prior to installation
The Battery Pack can be switched or un-switched
(night) circuit. When used with a switched fixture,
it is important that the power to the Battery Pack
must be provided by an un-switched circuit.
Damage to the battery will occur if the Test
Switch / Pilot Light connection is made for a
prolonged period of time without AC power being
provided.
Battery packs are not field serviceable
Allow Battery Packs to charge 24 hrs before initial
and full discharge testing
Do not locate the Test Switch / Pilot Light or route
cable within 1" of fixture lamps
Emergency lighting system should be tested per
all of the required tests and as often as local
codes require or at least quarterly to insure all
components are operational.
CONTAINS NICKEL-CADMIUM
RECHARGEABLE BATTERY.
MUST BE RECYCLED OR DISPOSED
OF PROPERLY.
Page 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QD MVOLT Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Psq500 mvoltPs 300 mvoltPs600 mvoltPs1400 mvolt

Table of Contents

Save PDF