Finishing; Installing The External Temperature Probe - Biasi Riva Advance Combi Installation & Operation Instructions

Wall hung gas boiler for central heating supply
Table of Contents

Advertisement

12. Electrical Connections/Wiring Cont.
• Route the electrical supply cord and the external control cord as illustrated in Fig. 12.10.
• Lock the cords in place with the flexible cord clamps.
• Replace the control panel reversing the steps on page 30.
The external probe must be installed on an external wall of the building, avoiding:
• Direct sun radiation.
• Wet walls or walls where mould tends to form.
• Installation near fans, exhaust or chimney vents.
RIVA ADVANCE COMBI MANUAL

12.5 Finishing:

To the external
control device
Figure 12.10

12.6 Installing the external temperature probe:

To the fused spur
isolation switch
32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents