MicroMax GPS350
Installation and Configuration
Quick Start
Refer to the SMR100 Soil pH and Resistivity Meter
User Guide (part number 122221-000) for complete
instructions.
A typical measurement session may include the following steps:
1
Remove the meter and probes from the carrying case.
2
Select measurement probe; connect probe to the meter.
3
Turn the SRM100 on by pressing and holding the POWER button for 5 seconds. The SRM100
will perform an auto-check and then display SRM RDY, select RES or pH Mode when ready
to take measurements.
4
Push probe into the soil to the depth of the desired measurement (the measurement sensors
are located at the tip of the probe).
5
Press the OHM-CM measurement button for the resistivity measurement. The soil resistivity
displays in about 20 seconds. Record measurement.
6
Press the pH measurement button for pH measurement (do not move probe). The soil pH
measurement displays in about one minute. Record measurement.
7
Remove the probe, and wipe the sensor array clean. See reverse side of this guide for
maintenance guidelines.
© 2017 American Innovations, Ltd.
SRM100 Soil pH and Resistivit y Meter
Quick Reference Guide
1 of 2
OHM-
pH
POWER
CM
SRM100
Soil pH and Resistivity Meter
Part No. 122220-000, Rev. 0
Need help?
Do you have a question about the SRM100 and is the answer not in the manual?
Questions and answers