Clearfield FieldSmart Installation Manual

Small count delivery (scd) panel
Hide thumbs Also See for FieldSmart:

Advertisement

Quick Links

FieldSmart
Small Count Delivery (SCD) Panel
®
Installation Manual
______________________________________________________
Manual 020418 REV A - Dec 2018

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FieldSmart and is the answer not in the manual?

Questions and answers

Summary of Contents for Clearfield FieldSmart

  • Page 1 FieldSmart Small Count Delivery (SCD) Panel ® Installation Manual ______________________________________________________ Manual 020418 REV A - Dec 2018...
  • Page 2: Table Of Contents

    FieldSmart Small Count Delivery (SCD) Panel ® Installation Manual _________________________________________________________ Table of Contents Application Description Technical Specifications Ship Along Items Installing Clearview Blue Cassettes Installing Clearview xPAKs Panel Mounting Cable Mounting and Routing Connector Cleaning Procedure Standard Warranty Proprietary Notice Technical Support Direct: 763.476.6866 •...
  • Page 3: Application

    Clearview® Blue Cassettes and xPAKs in a 1RU footprint. Description The FieldSmart SCD Panel mounts up to two Clearview devices: the 12 port Clearview Cas- sette or the two port, four port or six port Clear- view xPAK in a single rack unit.
  • Page 4: Ship Along Items

    Installation Manual _________________________________________________________ Ship Along Items In addition to the FieldSmart SCD Panel body, the following items are shipped along with the panel. (2) Panel Mounting Brackets with Radius Fingers (2) 23” Panel Mounting Extension Brackets (2) Middle LGX xPAK Mounting Brackets (2) Outside LGX xPAK Mounting Brackets 2.5ft Grommet Tape...
  • Page 5: Installing Clearview Blue Cassettes

    __________________________________________________________ Installing Clearview Blue Cassettes The front of the empty FieldSmart SCD Panel is shown below. Insert the Clearview Blue Cassette into the desired side of the panel. Using a phillips screwdriver, secure the cassette into place by tightening the retaining screws on the mounting ears of each side of the cassette If installing Clearview Blue Cassettes into both sides of the panel, repeat the previous steps on the other side.
  • Page 6: Installing Clearview Xpaks

    _________________________________________________________ Installing Clearview xPAKs In order to install LGX style Clearview xPAKs into the FieldSmart SCD Panel, the front end of the panel must first be configured to accept the xPAKs. Install the outside LGX xPAK mounting bracket onto the front face of the panel as shown. Use a philips head screw- driver to secure the bracket into place with two of the 6-32 x 1/4in panel assembly screws.
  • Page 7 FieldSmart Small Count Delivery (SCD) Panel ® Installation Manual __________________________________________________________ Install the middle LGX xPAK mounting bracket onto the front face of the panel as shown. Use a philips head screw- driver to secure the bracket into place with three of the 6-32 x 1/4in panel assembly screws.
  • Page 8 FieldSmart Small Count Delivery (SCD) Panel ® Installation Manual _________________________________________________________ Utilize the push/pull plungers to secure the Clearview xPAK into the panel. Ensure the outer grommets of the push/pull plungers are seated in the holes of the middle and outside LGX xPAK mounting brackets, and push the plunger in to expand the grommet and lock the xPAK in place.
  • Page 9: Panel Mounting

    Panel Mounting In order to mount the FieldSmart SCD Panel into a frame, you will first need to install the panel mounting brackets with radius fingers onto each side of the panel. Notice the 4 threaded holes along each side of the panel.
  • Page 10 FieldSmart Small Count Delivery (SCD) Panel ® Installation Manual _________________________________________________________ Utilizing 4, 3 or 2 (depending upon mounting bracket position) of the 6-32 x 1/4in panel assembly screws per side, secure the mounting brackets into place on both sides of the panel.
  • Page 11 FieldSmart Small Count Delivery (SCD) Panel ® Installation Manual __________________________________________________________ 19” Frame Configuration 23” Frame Configuration Using two 12-24 x 3/8in panel mounting screws per side, secure the SCD Panel into the frame, in either a 19” or 23” configuration.
  • Page 12: Cable Mounting And Routing

    _________________________________________________________ Cable Mounting and Routing In order to mount a cable to the back of the FieldSmart SCD Panel, a vinyl coated P-clip is included with the ship alongs. To increase the diameter of the cable so the P-clip will grip the cable properly, wrap grommet tape around the cable 1-2 laps, then secure to the panel using the provided 10-24 x 1/2in P-clip screw.
  • Page 13 FieldSmart Small Count Delivery (SCD) Panel ® Installation Manual __________________________________________________________ After splicing in the Cassettes/xPAKs, reinstall them into the panel. Pull the cable slack out the rear of the panel. Coil up the buffer tubes from each Cassette/xPAK into a coil of roughly 6” diameter. These can be secured with velcro.
  • Page 14: Connector Cleaning Procedure

    Inspect Then Connect These are Clearfield recommended products/applications. Use the product you feel will complete your cleaning procedures. Create a “best practice” for your company and follow those procedures.
  • Page 15 FieldSmart Small Count Delivery (SCD) Panel ® Installation Manual __________________________________________________________ Cleaning the Ferrule • Lightly moisten the fiber optic swab (2.5mm/38542F or 1.25mm/38040) by spotting a small amount (about 1”) of Electro-Wash PX or Electro-Wash MX pen onto the QbE. Hold the swab, 1 side down to the wetted area and hold for a count of 1-2-3-4-5.
  • Page 16 FieldSmart Small Count Delivery (SCD) Panel ® Installation Manual _________________________________________________________ Cleaning an MPO/MTP Connector Female Connector • Place one wiping paper on QbE-2 FiberSafe™ Cleaning Platen and apply small amount of precision cleaner (about 1” in diameter) with Electro-Wash MX pen on to one end of the wipe. (Figure 1) Figure 1 •...
  • Page 17: Standard Warranty

    Clearfield shall repair or replace the defective Product at its sole option and discretion, and return the repaired or replacement Product to Cus- tomer’s site, freight prepaid Note: If the Product is not found to be defective by Clearfield, the product will be returned to the Customer and the customer billed for freight in both directions.
  • Page 18: Proprietary Notice

    _________________________________________________________ Proprietary Notice Information contained in this document is copyrighted by Clearfield, Inc. and may not be duplicated in full or part by any person without prior written approval of Clearfield, Inc. Its purpose is to provide the user with adequately detailed documentation to efficiently install the equipment supplied. Every effort has been made to keep the information contained in this document current and accurate as of the date of publication or revision.

Table of Contents