Error Prediction - SARAD RTM1688-2 User Manual

Hide thumbs Also See for RTM1688-2:
Table of Contents

Advertisement

SARAD GmbH
14
For example, the correct interpretation of a measured Radon concentration of 780 Bq/m³
with a statistical 1error of ±15% is:
The real "true" Radon concentration lies with a likelihood of 68.3% within the range from
663 Bq/m³ (780 Bq/m³ - 15%) to 897 Bq/m³ (780 Bq/m³ + 15%).

Error Prediction

The relative statistical error E for a chosen confidence interval of k-Sigma can be predicted
from the number of detected counts N by the equation:
E[%] = 100% * k * (N) / N
The simple consequence is: The higher the number of counts the higher is the accuracy of
the measurement. From the opposite point of view one could ask: How many counts I have
to detect to achieve a predefined uncertainty?
Two items will affect the number of counted decays: The sensitivity of the instrument at the
one hand side and the time period used for counting process (integration interval) on the
other hand.
While the sensitivity is an instrument specific constant, the integration interval may be
expanded to the maximum acceptable value for the desired time resolution of a
measurement series.
The relationship between the measured Radon concentration C
and the number of counts
Rn
N within an integration interval T is:
C
= N / (T * S)
Rn
whereby S represents the Sensitivity of the instrument, given in the unit [cts/(min*kBq/m³)].
The sensitivity using the slow mode is double as high as in the fast mode (see chapter
"Theory of Operation") and whenever the required response time is more than 2 hours the
slow mode should be selected.
For the following examples a fast mode sensitivity of 4 cts/(min*kBq/m³) shall assumed
while the slow mode sensitivity shall be 8 cts/(min*kBq/m³).
The first question could be: Which integration interval T has to set to get a statistical
uncertainty less than 10% at a confidence level of 1if the expected Radon concentration is
200 Bq/m³?
A 1error of 10% requires 100 counts (100%* 1 * (100) / 100 = 10%). Using the fast mode,
the integration interval can be calculated by
T(fast) = N / (C
* S) = 100 cts / (0.2 kBq/m³ * 4 cts/(min*kBq/m³) = 125 min.
Rn
Because the required interval is longer than 2 hours, the slow mode is the better choice,
leading to the following result:
User Manual RTM1688-2 06-02-2019.docx

Advertisement

Table of Contents
loading

Table of Contents