Eriez P150 Installation, Operation And Maintenance Instructions

Precipitator vibrators

Advertisement

Quick Links

Installation, Operation
and Maintenance
Instructions
ERIEZ MAGNETICS
PRECIPITATOR
VIBRATORS
MODELS -
P150 AND P155
HEADQUARTERS: 2200 ASBURY ROAD, ERIE, PA 16506–1402 U.S.A.
WORLD AUTHORITY IN SEPARATION TECHNOLOGIES
VM-3580H
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the P150 and is the answer not in the manual?

Questions and answers

Summary of Contents for Eriez P150

  • Page 1 VM-3580H Installation, Operation and Maintenance Instructions PRECIPITATOR VIBRATORS MODELS - P150 AND P155 ERIEZ MAGNETICS HEADQUARTERS: 2200 ASBURY ROAD, ERIE, PA 16506–1402 U.S.A. WORLD AUTHORITY IN SEPARATION TECHNOLOGIES...
  • Page 2 Introduction This manual details the proper steps for installing, operating and maintaining the Eriez Precipitator Vibrators. Careful attention to these requirements will assure the most efficient and dependable performance of this equipment. If there are any questions or comments about the manual, please call Eriez Magnetics at 814-835-6000 for Precipitator Vibrator assistance.
  • Page 3: Table Of Contents

    Table of Contents ERIEZ PRECIPITATOR VIBRATORS - P150 AND P155 INSTALLATION ...................... 4 Mounting ......................4 Electrical Connections ..................4 OPERATION AND MAINTENANCE ............... 5 Routine Maintenance and Checking ............... 5 E-Frame and Anvil Gap Adjustment ..............5 REPAIRS ........................ 6 Springs ......................
  • Page 4: Installation

    FIGURE 1 name plate of the vibrator (or controller, if used). Where no controller is used, connections are as shown in Figure 1. Where an Eriez controller is used, connections are as shown in Figure Ground connections should always be used as shown.
  • Page 5: Operation And Maintenance

    Add or remove shims, part 13, equally at each side of the spring assembly, Eriez vibrators are operated by an alternating as shown in Figure 3, until impact pad, part 9, current electromagnet energized directly from any barely touches anvil part 10.
  • Page 6: Repairs

    Repairs SPRINGS COIL AND E-FRAME (E-FRAME Although spring failure will rarely occur if the unit ASSEMBLY) is operated within its limitations, springs may Since the coils are permanently embedded on the eventually fail. Such failure will cause the unit to center legs of the E-Frame, a coil and E-Frame gradually become weak or inoperative.
  • Page 7: Performance Tests And Standards

    Testing is done with standard maximum. Impacting should start at from 5% to loading in a standard test fixture designed by Eriez. 25% of full voltage, with maximum vibratory output obtained at full voltage.
  • Page 8 11. Product or Volume Variation Possibly incurable–customer to decide and correct if practical. Eriez and Eriez Magnetics are registered trademarks of Eriez Manufacturing Co, Erie, PA ©2018 Eriez Magnetics All Rights Reserved World Authority in Separation Technologies    ...