Download Print this page

ACD CAL 2000 LT Instruction Manual page 5

Gas generator, release i

Advertisement

Cell Installation and Removal
There are no tools required by the end user for ser-
vice of the instrument. The electrochemical cells
are shipped seperate of the unit and should be in-
stalled on receipt.
To install the cell, remove the bottom
cover of the instrument. This is done by pulling each of the
'plunger feet' on the bottom of the instrument. Once all of
the plungers have been pulled out, the bottom cover is sim-
ply removed from the instrument.
The cell is keyed to ensure proper alignment into the in-
strument. When installed, the circuit board of the cell should
be flat with the bottom of the instrument. Push up on the
clear window at the back of the instrument to eject the cell.
Page 3
warranty of fitness for a particular purpose. In no event
shall Advanced Calibration Designs, Inc. be liable for
direct, incidental or consequential loss or damage of any
kind connected with the use of its products or failure of its
products to function or operate properly.
The following is a listing of the available electrochemical
Cal 2000 LT cells and their standard warranty when
installed in equipment manufactured and supplied by
Advanced Calibration Designs, Inc.
10 Hour Generating Cells
1. Chlorine - One year or 10 hours of use.
2. Hydrogen Sulfide - One year or 10 hours of use.
3. Hydrogen Cyanide - One year or 10 hours of use .
4. Hydrogen - One year or 10 hours of use .
25 Hour Generating Cells
1. Chlorine - One year or 25 hours of use.
2. Hydrogen Sulfide - One year or 25 hours of use.
3. Hydrogen Cyanide - One year or 25 hours of use .
4. Hydrogen - One year or 25 hours of use .
Page 16

Advertisement

loading