ABB B23 Installation Manual page 6

Table of Contents

Advertisement

Available languages

Available languages

B23_B24_install.book Page 6 Thursday, May 30, 2013 4:01 PM
Technical Data
Current
Voltage
Pulse frequency
Pulse length
Terminal wire area
Tightening torque
Comm. terminal
Terminal wire area
Tightening torque
Transformer ratios
Config. current ratio
Pulse indicator
Pulse frequency
Pulse width
EMC
Impulse voltage test
Surge voltage test
Direct conn.
2 - 100 mA
24 VAC - 240 VAC, 24 VDC - 240 VDC. For
meters with only 1 output 5 - 40VDC.
1-999999 pulse(s) per kWh or MWh
10 - 990 ms
0.5 - 1 mm²
0.25 Nm
0.5 - 1 mm²
0.25 Nm
1000 imp/kWh
40 ms
6 kV 1.2/50μs (IEC 60060-1)
4 kV 1.2/50μs (IEC 61000-4-5)
6
Indirect conn.
1 - 9999 / 1 - 9
5000 imp/kWh

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B24

Table of Contents