Sentry SPD 5.5.5 Installation And Operation Manual page 46

Sentrysafe recording equipment user manual
Table of Contents

Advertisement

Sample Sequencer
1.
The 0 -1 VDC signal switching output board should have the jumpers on J1 as shown in Figure
21.
Connect the (+) terminal on the output board to the (+) terminal on the desired recorder
input channel using 22 gauge conductor. Connect the (-) terminal on the output board to the
recorder (-) input terminal. Maximum cable length is 32 ft. (10m).
2A.
If using one analyzer: Connect the analyzer (+) terminal to the Sample Sequencer I/O board (+)
terminal using 22 gauge conductor. Connect the I/O board (-) terminal to the recorder (+)
terminal on the desired input channel. Connect the analyzer (-) terminal to the recorder (-)
terminal. If using one analyzer, go to step 3.
2B.
If using two or more analyzers: Select one of the analyzers for imputing its signal to the
Sequencer. Perform step 2A above. Then, connect the remaining analyzer(s) output signals
to the recorder input channels as shown in Figure 21.
3.
Install the signal switching output board in either of two locations marked on the Sample
Sequencer enclosure as shown in Figure 17.
corresponding connector of the display board. The board should be installed such that board
components are on the right side as viewed from the rear.
SENTRY
Equipment Corp • P. O. Box 127 • Oconomowoc, WI 53066 • 262/567-7256 • FAX: 262/567-4523
Wiring to Output 0-1 VDC - Figure 21
Web: www.sentry-equip.com • e-mail: sales@sentry-equip.com
Install by plugging the board into the
Installation
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sample sequencer

Table of Contents