Download Print this page

JOMAR Add-A-Valve Installation Instructions

Advertisement

Quick Links

To assist with installation, check off each step as you complete it
Step 1
Before installing the Add-A-Valve®, clean the copper tubing with a fine emery
cloth to a bright shiny finish.
Step 2
Disassemble the Add-A-Valve® body by removing the four (4) 316 stainless
steel bolts.
Step 3
You will be supplied two small tubes of gasket sealant. One tube per body half.
®
®
®
®
Central Office & Distribution Center
7243 Miller Drive
Warren, MI 48092
Phone: 800-325-5690
Fax: 800-628-4194
Apply a liberal amount of gasket sealant and brush evenly across the entire body
www.jomar.com
half surface.
For Technical Support
Add-A-Valve
Monday thru Friday
®
8am - 6pm EST
Installation
Do this to both body halves and allow 1-2 minutes for dry time.
Instructions
Call 1-800-325-5690 or visit:
www.jomar.com
1
To ensure proper step order, follow the page numbers >
3

Advertisement

loading
Need help?

Need help?

Do you have a question about the Add-A-Valve and is the answer not in the manual?

Questions and answers

Summary of Contents for JOMAR Add-A-Valve

  • Page 1 To assist with installation, check off each step as you complete it Step 1 Before installing the Add-A-Valve®, clean the copper tubing with a fine emery cloth to a bright shiny finish. Step 2 Disassemble the Add-A-Valve® body by removing the four (4) 316 stainless steel bolts.
  • Page 2 CAUTION When it air tests without leaks, remove both test caps and replace with the stem Pipe hangar supports should be installed on both sides of the Add-A-Valve®, 12 inches on cutter and bottom cap. center to eliminate stress at the ends of the valve. If hangars cannot be installed, it is NOT recommended to use the Add-A-Valve®.