Ice Qube Evolution Series Operation And Installation Manual

Zone 2 atex and iecex hazardous locations
Hide thumbs Also See for Evolution Series:

Advertisement

Z2
Evolution Series Air Conditioners
Zone 2 ATEX and IECEx Hazardous Locations*
OPERATION AND INSTALLATION MANUAL
*** IMPORTANT ***
PLEASE READ this manual and follow the instructions for safe and satisfactory installation and operation of this system. Keep
this manual for future reference. Some information may not apply to
all systems.
RELATED DRAWING; DO NOT CHANGE WITHOUT AUTHORIZED PERSON APPROVAL
*
FOR ZONE 2 ATEX/IECEx UNITS, ALL COMPONENTS ARE NON-IGNITION SOURCE COMPONENTS AND DO NOT REQUIRE PURGE PROTECTION FROM
ANY SOURCE

Advertisement

Table of Contents
loading

Summary of Contents for Ice Qube Evolution Series

  • Page 1 Evolution Series Air Conditioners Zone 2 ATEX and IECEx Hazardous Locations* OPERATION AND INSTALLATION MANUAL *** IMPORTANT *** PLEASE READ this manual and follow the instructions for safe and satisfactory installation and operation of this system. Keep this manual for future reference. Some information may not apply to all systems.
  • Page 2: Table Of Contents

    Introduction ........................... 3   Basic Unit Operation ........................3   Preservation Instructions ......................4   Pre-Installation Test ........................5   Preparing the Enclosure ....................... 6   Mechanical Installation Instruction ..................... 6   Electrical Installation Instruction ....................8   Alarm Installation Instruction ....................10  ...
  • Page 3: Introduction

    The closed-loop cold air supply stream circulates cold air from the Ice Qube TMS to your electronics enclosure. This air returns to the Ice Qube TMS bringing with it unwanted heat and humidity from inside your enclosure. Heat and humidity is then removed by a heat exchanger which is part of the vapor- compression refrigeration system.
  • Page 4: Preservation Instructions

    6. Enclosure gasket Handling Ice Qube recommends that the unit remains in the proper upright position, as indicated on the shipping container. The unit must remain upright for a minimum of 24 hours before initial operation to ensure oil has returned to the compressor. Operation before the 24-hour time may cause compressor damage and shorten the life of the system.
  • Page 5: Pre-Installation Test

    Before installing the Ice Qube system on your enclosure, Ice Qube recommends that the unit operates for 20-30 minutes to ensure it is functioning properly. Although the Ice Qube TMS has been tested at the factory, internal damage may have occurred during shipping which may have not been apparent during the unpacking inspection.
  • Page 6: Preparing The Enclosure

    After checking that all opening and bolt holes are in alignment, assemble and tighten the (2) ¼”-20 nuts and (4 or 6 depending on model) ¼”-20 x 1” bolts supplied with you Ice Qube TMS by hand. Check to ensure gasket will properly seal the Ice Qube TMS to your enclosure.
  • Page 7 Ambient Side Enclosure Side Figure 1: Enclosure Installation Figure 2: Push-to-Connect Fitting Rev. 2...
  • Page 8: Electrical Installation Instruction

    Ice Qube TMS. Each Ice Qube TMS been designed to operate at a range of voltages and frequencies. See unit label(s) for correct voltage and frequency for your model(s).
  • Page 9 Figure 4: Terminal Block Figure 5: Power Terminal Block Rev. 2...
  • Page 10: Alarm Installation Instruction

    Figure 6: Alarm Output Operating Your System Once the Ice Qube TMS has been installed onto the enclosure and the power cable has been attached to a properly grounded electrical connection with adequate voltage and current supply, the unit is ready for operation.
  • Page 11: Programming The Standard Controller

    Programming the Standard Controller The digital controller has many features that may or may not be required for all applications. The controller has been programmed at the factory with typical default settings for immediate system operation. Please review the following default settings: 1.
  • Page 12 Press “3” to continue. The “Alarm” LED will flash and the display will show “ALL” indicating the “ALL” alarm on/off status. Press “3” and the display will show either “ON” or “OFF”, indicating current alarm status. Press “1” or “2” to toggle the mode as desired. If the “OFF” mode is selected, no alarms will activate and the audible on/off select and POA, Power Off Alarm, functions are skipped.
  • Page 13: Alarm Operation

    (Version 3.18 and later only) 5. Optional Alarm Output: Ice Qube offers an optional dry contact alarm output (XO3) that provides both a normally open (close on alarm) and a normally closed (open on alarm) set of contacts. This alarm signal is...
  • Page 14: Maintenance

    A mild soap solution may be used if necessary. Trouble Shooting Contact Ice Qube if the air conditioning system should fail to operate satisfactorily during the first year of operation. DO NOT remove the cover without first notifying customer service. Removal of the cover will immediately void the warranty.
  • Page 15 Is there adequate space around the air conditioner for airflow? Yes  No  Has the enclosure population remained the same? Notes: For additional support call: Ice Qube at 1-888-867-8234 Please have above checklist completed before you call. Rev. 2...
  • Page 16: Schematic Wiring Diagrams

    Schematic Wiring Diagrams 120V/220V/230V Figure 8 IQ351153 Rev A Rev. 2...
  • Page 17: 400V/460V/480V

    400V/460V/480V Figure 9 IQ351154 Rev A Rev. 2...
  • Page 18: Specification Drawing

    Specification Drawing 1000EVZ2 Figure 10...
  • Page 19: 2000Evz2

    2000EVZ2 Figure 11 Rev. 2...
  • Page 20: 3000Evz2

    3000EVZ2 Figure 12 Rev. 2...
  • Page 21: 4000Evz2

    4000EVZ2 Figure 13 Rev. 2...
  • Page 22: 5000Evz2

    5000EVZ2 Figure 14 Rev. 2...
  • Page 23: 6000Evz2

    6000EVZ2 Figure 15 Rev. 2...
  • Page 24: 8000Evz2

    8000EVZ2 Figure 16 Rev. 2...
  • Page 25: 10000Evz2

    10000EVZ2 Figure 17 Rev. 2...
  • Page 26: 12000Evz2

    12000EVZ2 Figure 18 Rev. 2...
  • Page 27: 14000Evz2

    14000EVZ2 Figure 19 Rev. 2...
  • Page 28: 17000Evz2

    17000EVZ2 Figure 20 Rev. 2...
  • Page 29: 20000Evz2

    20000EVZ2 Figure 21 Rev. 2...
  • Page 30: Iq1-2-3000Evz2 Gasket And Cutout

    IQ1-2-3000EVZ2 Gasket and Cutout  Same Gasket and Cutout for IQ1000EVZ2, IQ2000EVZ2, and IQ3000EVZ2 Figure 22 Rev. 2...
  • Page 31: Iq4-5-6000Evz2 Gasket And Cutout

    IQ4-5-6000EVZ2 Gasket and Cutout Same Gasket and Cutout for IQ4000EVZ2, IQ5000EVZ2, and IQ6000EVZ2 Figure 23 Rev. 2...
  • Page 32: Iq8-10-12000Evz2 Gasket And Cutout

    IQ8-10-12000EVZ2 Gasket and Cutout Same Gasket and Cutout for IQ8000EVZ2, IQ10000EVZ2, and IQ12000EVZ2 Figure 24 Rev. 2...
  • Page 33: Iq14-17-20000Evz2 Gasket And Cutout

    IQ14-17-20000EVZ2 Gasket and Cutout Same Gasket and Cutout for IQ14000EVZ2, IQ17000EVZ2, and IQ20000EVZ2 Figure 25 Rev. 2...
  • Page 34 Ice Qube, Inc. ("Ice Qube") warrants that the products manufactured by Ice Qube (the "Products") are free of defects in material and workmanship which impair the operation of the Products, under normal and proper use and service, for a period of one (1) year from the date of shipment FCA from Ice Qube’s facility located in Greensburg, Pennsylvania (the "Standard Warranty").
  • Page 35 Ice Qube's advice relating to the technical usage of the Products or the intellectual property rights of others, whether provided orally or in writing or through the provision of test results, is given in accordance with Ice Qube's best knowledge at that time, but shall at all times be deemed to be non-binding. Such advice does not relieve customer from the obligation, and customer accepts full responsibility, to confirm for itself the suitability of the Products for their intended purpose(s).
  • Page 36: Notes

    Notes: Rev. 2...

Table of Contents