Page 2
Technical Support Site If you encounter any installation or operational issues with your product, check the pertinent section of this manual to see if the issue can be resolved by following outlined procedures. Visit https://www.VertivCo.com/en-us/support/ for additional assistance.
5.2.2 Field Piping Guidelines for a Liebert DSE and Liebert Premium MC Condenser 5.3 Refrigerant Planning Values 5.3.1 Recommended Refrigerant Line Sizes 5.4 Equipment Application Guidelines 5.5 Refrigerant Oil Addition Procedures 5.6 System Dehydration/Leak Test 5.7 System Charging with Liebert MC Vertiv | Liebert® MC™ Installer/User Guide |...
Page 4
11.2.2 What to Use to Clean the Condenser Coil 11.2.3 How to Clean the Condenser Coil 11.3 Fan Replacement 11.3.1 Verify the Fan Address 11.4 Premium Efficiency Control Board Replacement 11.4.1 Replacement Preparation 11.4.2 Installation 12 Preventive Maintenance Checklist Vertiv | Liebert® MC™ Installer/User Guide |...
The only way to ensure that there is NO voltage inside the unit is to install and open a remote disconnect switch. Refer to unit electrical schematic. Follow all local codes. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 6
Fan motors, transformers, piping and other components may become extremely hot during normal operation. Wear thermally insulated gloves and appropriate protective clothing and allow time for components to cool when working within the cabinet or electric control enclosure. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 7
Care must be exercised to avoid damage to the compressor. Vertiv™ recommends connecting a sight glass between the charging hose and the compressor suction service valve. This will permit adjusting the cylinder hand valve so that liquid can leave the cylinder while allowing vapor to enter the compressor.
Page 8
Using acid-based or sodium hydroxide-based cleaners can damage the Liebert MC condenser coil and cause a loss of charge. This could cause equipment damage as well as damage to the surrounding structure. Vertiv | Liebert® MC™ Installer/User Guide |...
The fans are controlled by the premium control board using pressure transducer signals from the refrigerant circuit and factory programming to control the refrigerant head pressure. Vertiv | Liebert® MC™ Installer/User Guide |...
Liebert Lee-Temp kit is optional for condensers and is field-installed. Condenser control boards are factory-configured for Liebert Lee-Temp if they are ordered with Liebert Lee-Temp receivers. They can be field-configured if a Liebert Lee-Temp system is added later. Vertiv | Liebert® MC™ Installer/User Guide |...
When both LEDs are Off, there is no power to the condenser, either from a power failure or because the condenser disconnect is in the Off position. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 14
This page intentionally left blank. Vertiv | Liebert® MC™ Installer/User Guide |...
• To ensure adequate air supply, Vertiv™ recommends that condensers be installed in an area with clean air, away from loose dirt and foreign matter that might clog the coil. In addition, condensers should be located no closer than 3 feet (1m) from a wall, obstruction or adjacent unit.
Risk of improper forklift handling. Can cause unit damage. Keep the forklift tines level and at a height that will fit under the skid. NOTICE Risk of improper storage. Can cause unit damage. Keep unit upright and protected from contact damage. Vertiv | Liebert® MC™ Installer/User Guide |...
Upon arrival of the unit and before unpacking, verify that the labeled equipment matches the Bill of Lading. Carefully inspect all items for either visible or concealed damage. Damage should be immediately reported to the carrier and a damage claim filed with a copy sent to Vertiv™ or to your sales representative.
Figure 3.2 Forklift position with 1- to 4-fan condensers Using a Crane • Vertiv™ recommends using slings rated for the unit weight. • Spreader bars must be used for sling stability and to keep the slings from pressing against the unit.
Recommended tools for attachment is a 1/2” (13mm) socket and ratchet. • More legs may be available for installation than are shown. This will depend on the unit type and number of fans. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 31
Make sure that the spreader bars wider are than the unit. If the spreader bars are too short, the slings may crush the unit. Figure 3.5 Securing slings to condensers for lifting off skid Vertiv | Liebert® MC™ Installer/User Guide |...
Page 32
Make sure that the spreader bars wider are than the unit. If the spreader bars are too short, the slings may crush the unit. The unit is ready to be lifted and moved to its installation location. Vertiv | Liebert® MC™ Installer/User Guide |...
2. Assemble the leg structure according to the instructions supplied with the legs. Cross-bracing for 4 legs is shown in Figure 3.8 on the next page. NOTE: When assembling the leg structure, DO NOT tighten the cross-brace hardware until the condenser cabinet is fastened to the legs. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 34
5. To rotate the unit, a mechanized method is recommended, but if one is not available, use a minimum of four properly-protected individuals to rotate the elevated unit 90 degrees so the unit fans are facing up, Figure 3.9 on the facing page. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 35
Make sure that the spreader bars wider are than the unit. If the spreader bars are too short, the slings may crush the unit. The unit is ready to be lifted and moved to its installation location. Vertiv | Liebert® MC™ Installer/User Guide |...
The installing contractor is responsible for the proper installation of all anchors and mounting hardware, observing the mounting requirements detailed in the seismic or wind installation drawings and additionally outlined by the engineer of record. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 37
(ANSI B18.22.1-1965, R1975) selected to match the nominal anchor diameter must be installed at each anchor location between the anchor head and equipment for tension load distribution. See Liebert Seismic Application—Optional Unit Configuration on page 99 for additional information. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 38
This page intentionally left blank. Vertiv | Liebert® MC™ Installer/User Guide |...
NOTE: Use copper wiring only. Make sure that all connections are tightened to the proper torque mentioned on the component. Vertiv | Liebert® MC™ Installer/User Guide |...
See Table 4.2 on the facing page for power requirements. Table 4.1 Electrical data, three-phase, 60Hz condenser, premium models Model Voltage Small Platform 208/230V 380V MCS028 460V 575V 208/230V 380V MCS056 460V 575V Medium Platform Vertiv | Liebert® MC™ Installer/User Guide |...
Page 41
Wye 3-phase systems with solidly grounded neutral. Refer to Wye- vs. Delta-Connected Power Supply on the next page. ™ Table 4.2 Electrical data, Liebert Lee-Temp receiver, 60Hz Rated Voltage - Single- 208/230 Phase Watts/Receiver Amps Vertiv | Liebert® MC™ Installer/User Guide |...
575V Wye with solidly grounded neutral and 332V line-to-ground (uses step-down tranformers) Unacceptable Power Supplies—208V to 575V Nominal Units • Wye with high-resistance (or impedance) ground • Delta without ground or with floating ground • Delta with corner ground Vertiv | Liebert® MC™ Installer/User Guide |...
All wiring must be sized and selected for insulation case per NEC and other applicable codes. • Do not bend cables to less than four times the diameter of the cable. • Do not deform cables when securing in bundles or when hanging them. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 44
Keep CANbus cables at least 12 inches (305mm) from high-voltage sources, including wiring. Figure 4.2 CANbus communication and interlock connections between a Liebert DSE, one premium Liebert MC and a Liebert EconoPhase CANbus Cable: A, B Interlock Wire: F Vertiv | Liebert® MC™ Installer/User Guide |...
Page 45
Figure 4.3 CANbus communications and interlock connections between a Liebert DSE, two Liebert MC condensers and a Liebert EconoPhase CANbus Cable: A, B, C Interlock Wire: F, G Low-voltage Control Wiring—CANbus Communication and Interlock Connections on page 43 for cable and wire requirements. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 46
Figure 4.4 CANbus communications and interlock connections between a Liebert DS and Liebert MC condenser CANbus Cable: A Interlock Wire: F Low-voltage Control Wiring—CANbus Communication and Interlock Connections on page 43 for cable and wire requirements. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 47
Figure 4.5 CANbus communication and interlock connections between a Liebert CRV 600 mm (24 in.) and a Liebert MC premium condenser CANbus Cable: A Interlock Wire: B Low-voltage Control Wiring—CANbus Communication and Interlock Connections on page 43 for cable and wire requirements. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 48
Figure 4.6 CANbus communications and interlock connection between Liebert CRV 300 mm (12 in.) and a Liebert MC premium condenser CANbus Cable: A Interlock Wire: B Low-voltage Control Wiring—CANbus Communication and Interlock Connections on page 43 for cable and wire requirements. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 49
™ Figure 4.7 CANbus communication and interlock connection between Liebert PDX and a Liebert MC premium condenser CANbus Cable: A Interlock Wire: B Low-voltage Control Wiring—CANbus Communication and Interlock Connections on page 43 for cable and wire requirements. Vertiv | Liebert® MC™ Installer/User Guide |...
Three-Phase Electrical Service—Terminals are on the top of the disconnect switch for one-fan and two-fan units. Terminals are on the bottom of the disconnect switch for three-fan and four- fan units. Three-phase service not by Vertiv™. See NOTICE on page 43.
Page 51
• 5B is the “END OF LINE” jumper. • 5C is the CANbus “DEVICE ADDRESS DIP SWITCH.” CANbus cable not by Vertiv™. See requirements in Notes on Electrical Connections on page 43. 6. Remote Unit Shutdown—Replace exiting jumper between Terminals TB38-1 and TB38-2 with field-supplied, normally closed switch having a minimum 75VA, 24VAC rating.
Page 52
This page intentionally left blank. Vertiv | Liebert® MC™ Installer/User Guide |...
• Protect all refrigerant line components within 18" (460mm) of the brazing site by wrapping them with wet cloth or suitable heat sink compound. • Isolate piping from building using vibration isolating supports. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 54
NOTE: Failure to use compressor oils recommended by compressor manufacturer will void compressor warranty. Consult Vertiv™ or the compressor manufacturer for further recommendations or if you have questions about compressor oils. Refer to ASHRAE Refrigeration Handbook for general good practices for refrigeration piping. The Liebert indoor cooling unit has a factory-installed high-pressure safety switch in the high side refrigerant circuit.
Follow all proper brazing practices, including a dry nitrogen purge to maintain system cleanliness. The condenser connection pipes must be wrapped with a wet cloth to keep the pressure and temperature sensors cool during any brazing. Vertiv | Liebert® MC™ Installer/User Guide |...
Figure 5.7 Liebert MC Condenser piping—Single-circuit, 1-, 2-, 3- and 4-fan units Table 5.1 Liebert MC Condenser piping sizes—Single-circuit units Connection Sizes, OD, in (mm) Model No. Number of Fans Condenser Circuits Hot Gas Line Liquid Line MCS028 MCM040 MCM080 1-1/8 Vertiv | Liebert® MC™ Installer/User Guide |...
Page 63
Condenser Circuits Hot Gas Line Liquid Line MCL055 1-1/8 MCL110 1-3/8 1-1/8 MCL165 1-3/8 1-1/8 MCL220 1-5/8 1-3/8 Source: DPN002166, Rev. 3 ™ Figure 5.8 Condenser piping for single-circuit condensers (with Liebert Lee-Temp Vertiv | Liebert® MC™ Installer/User Guide |...
Page 65
Figure 5.9 Piping: dimensions—Dual circuit two-fan and four-fan units Table 5.3 Piping: dimensions—Dual-circuit, two-fan and four-fan units Connection Sizes, OD, in Model # Number of Fans Condenser Circuits Hot Gas Line Liquid Line MCS056 MCM080 MCL110 1-1/8 Vertiv | Liebert® MC™ Installer/User Guide |...
Page 66
Connection Sizes, OD, in Model # Number of Fans Condenser Circuits Hot Gas Line Liquid Line MCM160 1-1/8 MCL220 1-3/8 1-1/8 Source: DPN002425, Rev. 5 ™ Figure 5.10 Piping: Dimensions with Liebert Lee-Temp —Dual circuit condensers Vertiv | Liebert® MC™ Installer/User Guide |...
Page 67
Liquid Line to Lee-Temp Valve Receiver Out Rotalock Liquid Circuits ODS, In. IDS In. MCS056 MCM080 MCL110 1-1/8 1-1/8 MCL160 1-1/8 1-1/8 1-1/8 MCL220 1-3/8 1-1/8 1-3/8 1-1/8 1-1/8 Source: DPN002426, Rev. 6 Vertiv | Liebert® MC™ Installer/User Guide |...
5.2.2 Field Piping Guidelines for a Liebert DSE and Liebert Premium MC Condenser ™ Figure 5.11 Condenser and Liebert EconoPhase , typical unit arrangement diagram layout for dual-circuit system Vertiv | Liebert® MC™ Installer/User Guide |...
Page 69
™ Figure 5.12 Condenser and Liebert EconoPhase , typical unit arrangement diagram layout for single-circuit system Vertiv | Liebert® MC™ Installer/User Guide |...
7/8 1 Hot Gas Line — PX023 Liquid Line — 1-1/8 1 Hot Gas Line — PX029 Liquid Line — Hot Gas Line 1-1/8 1-1/8 1-1/8 1-1/8 1-1/8 DA050/ DA080/ DA085 Liquid Line Vertiv | Liebert® MC™ Installer/User Guide |...
Page 77
Downsize vertical riser one trade size (1-1/8” to 7/8” or 7/8” to 3/4” or 5/8” to 1/2”). When the vertical elevation between the indoor DA150/165 unit exceeds 25 ft., the liquid-line pipe diameter can be 7/8”. Digital scroll not available on 077 and 105 models. Vertiv | Liebert® MC™ Installer/User Guide |...
Pump-down must be disabled on the indoor unit when using the Liebert MC condenser, due to the reduced volume in the condenser coil. Vertiv™ recommends adding a discharge line check valve and crankcase heater when connecting the Liebert MC condenser to Liebert indoor units built before 2012. The check valve and crankcase heater are needed for compressor protection.
Care must be exercised to avoid damage to the compressor. Vertiv™ recommends connecting a sight glass between the charging hose and the compressor suction service valve. This will permit adjusting the cylinder hand valve so that liquid can leave the cylinder while allowing vapor to enter the compressor.
5. Piping is routed to reduce potential of rub-through or chaffing. 6. Hot gas line on Liebert Lee-Temp is fastened to the side of the cabinet and ™ _________ isolated for vibration reduction. Vertiv | Liebert® MC™ Installer/User Guide |...
2. Installation materials and tools have been removed from in and around all _________ equipment (literature, shipping materials, tools, etc.). 3. Blank startup sheet located, ready for completion by installer or start-up _________ technician. Vertiv | Liebert® MC™ Installer/User Guide |...
Open all local and remote unit electrical power supply disconnect switches, verify with a voltmeter that the power is Off and verify that all fan blades have stopped rotating before working on or near the fans. Vertiv | Liebert® MC™ Installer/User Guide |...
5. Check that air is being drawn through the coil and discharged out the fan assembly. 6. Complete Liebert MC Condensers Warranty Inspection Check Sheet, Document # PSWI-8542- 408CO. NOTE: This document must be completed and forwarded to your local Vertiv™ sales office to validate warranty. •...
If they are, replace the transformer. Jumper not installed between 24V and Fan will not run Install jumper between 24V and DIN1 (for Ziehl Abegg fan motor). DIN1 (for Ziehl-Abegg fan motor). Vertiv | Liebert® MC™ Installer/User Guide |...
Page 88
This page intentionally left blank. Vertiv | Liebert® MC™ Installer/User Guide |...
LED’s and four keys as human machine interface (see Figure 9.2 on page 91). NOTE: Indicator lights should be On to indicate signal is present. See Figure 9.1 on the next page, #1, 2 and 3. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 90
Figure 9.1 Premium efficiency fan control board Vertiv | Liebert® MC™ Installer/User Guide |...
In initial screen, presses ESC key, the LED enters the first menu of the main menu. The main menu includes four menus: • Analog Signals Menu • Active Alarms Menu • History Alarms Menu • Configuration Menu Vertiv | Liebert® MC™ Installer/User Guide |...
ID and signal value are displayed alternatively. The operation and item structure of analog signals menu are shown in Figure 9.5 below. Table 9.1 on the facing page defines the signals. Figure 9.5 Analog Signals Menu Vertiv | Liebert® MC™ Installer/User Guide |...
Firmware Version Build — Source: 303847P1 Rev. 4 9.2 Premium Efficiency Condenser Alarm Codes The following procedure and chart details the alarm codes that may be displayed from the Active and History Alarm registers. Vertiv | Liebert® MC™ Installer/User Guide |...
The meanings of alarm information ID are given in Table 9.2 on the facing page and Table 9.3 on page 96. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 95
Condenser pressure 1 low alarm charge Condenser pressure 2 low alarm EC Fan speed mode maximum must be overridden due Condenser pressure 1 No action is needed. to condenser pressure 1 high high Vertiv | Liebert® MC™ Installer/User Guide |...
Page 96
(1-4) 08 For cause 2, replace EC Fan overload 3. Ambient temperature is too For cause 3, check ambient temperature. high (1-4) 09 EC Fan phase failure alarm Phase failure Check power supply Vertiv | Liebert® MC™ Installer/User Guide |...
Page 97
NOTE: (1-4) means the EC Fan addresses. For example, (1-4) 00 means 100 for EC Fan1, and means 200 for EC Fan2, and means 300 for EC Fan3, and means 400 for EC Fan4. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 98
This page intentionally left blank. Vertiv | Liebert® MC™ Installer/User Guide |...
As a minimum, 3/8” grade anchors with American National Standard Series W, Type A, plain washers (ANSI B18.22.1-1965, R1975) selected to match the nominal anchor diameter must be installed at each anchor location between the anchor head and equipment for tension load distribution. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 100
Figure # in Figure 10.1 Maximum Anchor Maximum Anchor Models above Maximum Compressive Maximum Compressive Reaction lb Reaction lb Tensile Shear Tensile Shear MCS028 Without Figure 1 Receiver With Figure 2 Receiver MCM040 Vertiv | Liebert® MC™ Installer/User Guide |...
Page 101
MCL055 Without Figure 1 Receiver With Figure 2 Receiver ρ * All loads are calculated per ASCE 7-05, Chapter 13.6 Sds = 2.0, R = 6.0, a = 2.5 Source: DPN002414 Rev. 3 Vertiv | Liebert® MC™ Installer/User Guide |...
Page 102
Model # Maximum Maximum 10.2 above Compressive Compressive Tensile Shear Tensile Shear Reaction lb Reaction lb MCS056 Without Receiver Figure 3 With Receiver Figure 5 MCM080 Single or Dual Circuit Figure 3 without Receivers Vertiv | Liebert® MC™ Installer/User Guide |...
Page 103
* All loads are calculated per ASCE 7-05, Chapter 13.6 Sds = 2.0, R = 6.0, a = 2.5 Source: DPN002414 Rev. 3 Figure 10.3 Seismic anchoring loads for a three-fan Liebert MC Vertiv | Liebert® MC™ Installer/User Guide |...
Page 104
* All loads are calculated per ASCE 7-05, Chapter 13.6 Sds = 2.0, R = 6.0, a = 2.5 ρ Source: DPN002414 Rev. 3 Figure 10.4 Seismic anchorage loads for a four-fan Liebert MC Vertiv | Liebert® MC™ Installer/User Guide |...
Page 105
ρ * All loads are calculated per ASCE 7-05, Chapter 13.6 Sds = 2.0, R = 6.0, a = 2.5 Source: DPN002414 Rev. 3 Figure 10.5 Seismic anchorage loads for 36-60” extended leg Vertiv | Liebert® MC™ Installer/User Guide |...
Page 106
MCL220 Single Circuit with Receiver MCL220 Dual Circuit with Receivers ρ * All loads are calculated per ASCE 7-05, Chapter 13.6 Sds = 2.0, R = 6.0, a = 2.5 Source: DPN002414 Rev. 3 Vertiv | Liebert® MC™ Installer/User Guide |...
The flexible conduit must have at least one bend between the rigid connection at the unit cabinet and the connection to rigid conduit or foundation. Figure 10.6 Seismic piping and wiring considerations Vertiv | Liebert® MC™ Installer/User Guide |...
Page 108
This page intentionally left blank. Vertiv | Liebert® MC™ Installer/User Guide |...
In winter, do not permit snow to accumulate around the sides or underneath the condenser coil. Monthly and semi-annual inspections and maintenance are recommended for proper system operation. Use copies of Preventive Maintenance Checklist on page 123 for each of these inspections. Vertiv | Liebert® MC™ Installer/User Guide |...
Otherwise, damage to the fins could result. If a cleaner is required, Vertiv™ recommends using a neutral cleaner, neither acidic nor base. Acid-type cleaners can damage the coil fins and surrounding areas. Many sites do not allow the use of acidic cleaners for environmental reasons.
Disconnect all local and remote electrical power supplies to the unit, wait 10 minutes and verify with a voltmeter that the power is Off and that all fan blades have stopped rotating before working on or near the fans. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 112
10. Verify that the fan blades rotate freely when installed in unit. 11. Install the new cable glands included with the new EC Fan. Torque for the cable glands is: • 630mm and 710mm fans: 19.5 to 24.75 in-lb (2.2 to 2.8 Nm) Vertiv | Liebert® MC™ Installer/User Guide |...
Page 113
19. The control board will flash F00 on the display when it has completed its boot cycle. 20. Press the ESC button. 21. Use the Up or Down arrow key until C-- is on the display. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 114
44. Use the Up or Down arrow until A-- is on the display. 45. Press ENT button. 46. Use the Up or Down arrow to see if any of the following errors are shown. • 115: Unable to communicate with Fan 1. Vertiv | Liebert® MC™ Installer/User Guide |...
21. Press the ESC button for C24 to be shown on the display. All fans should return to a normal speed based on the pressure input and the state of indoor unit’s compressor. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 116
0.00 pressure PID Kdp Refrigerant temperature max 35°C 95.0°F 35°C 95.0°F 35°C 95.0°F 35°C 95.0°F Range 30 - 40°C; 86 - 104°F Refrigerant temperature max 35°C 95.0°F 35°C 95.0°F 35°C 95.0°F 35°C 95.0°F Vertiv | Liebert® MC™ Installer/User Guide |...
Page 117
-10% to 10% C50-C58 Internal system use only! "0" = Metric (bar, Prefered display °C) units. "1" = Imperial(psi, °F) Save configuration to USB flash drive. Pressing ENT will execute the function immediately. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 118
Note: Please consult factory before making any changes to the parameter settings. Changing the parameters without proper instructions can lead to poor system performance. Figure 11.1 Ziehl-Abegg small, medium and large fan, Liebert MC series MCS, MCM and MCL Vertiv | Liebert® MC™ Installer/User Guide |...
Page 119
Figure 11.2 EBM small and medium fan, Liebert MC series MCS/MCM Figure 11.3 EBM large fan—Liebert MC series MCL Vertiv | Liebert® MC™ Installer/User Guide |...
• Jumper on J5 on Pins 1 and 2. 2. Locate the latest revision of the HMI parameters label, 303847P1, included with the new control board. Figure 11.4 Jumper locations on Control Board Vertiv | Liebert® MC™ Installer/User Guide |...
17. Change the parameters to match the parameters from the control board that was removed if they were obtained from the old board in step 4. See step if the parameters were unavailable. Vertiv | Liebert® MC™ Installer/User Guide |...
Page 122
22. Verify that there are no communication alarms with the fans or with the cooling unit the Liebert MC is serving. 23. Verify proper fan operation by adjusting the cooling unit that this condenser serves so that it calls for cooling. Vertiv | Liebert® MC™ Installer/User Guide |...
However, maintenance intervals may need to be more frequent based on site- specific conditions. Review the unit user manual for further information on unit operation. Vertiv™ recommends the use of trained and authorized service personnel, extended service contracts, and factory-certified replacement parts.
Page 124
8. Check/Re-torque wire connections ______ 9. Check contactors for pitting (replace if pitted) ______ 10. Verify operation sequence/set points ______ 11. Charge verification: ______ a. Outdoor Ambient Temperature ------__________ ______ b. Subcooling ------__________ ______ c. Indoor-unit Return-air Temperature ------__________ Vertiv | Liebert® MC™ Installer/User Guide |...
Page 126
Signature Company Make photocopies for your records. Compare readings/information to previous maintenance worksheet. To locate your local Liebert representative for Liebert engineered parts, check the Liebert Web site : www.liebert.com or call 1-800-LIEBERT. Vertiv | Liebert® MC™ Installer/User Guide |...