NetThings Energy Manager Specification & Installation Manual page 2

Energy, heat and water monitoring package

Advertisement

ELECTRICIAN
PLEASE READ THESE INSTRUCTIONS IMMEDIATELY ON
RECEIPT OF THIS PRODUCT AND CARRY OUT
.
STEPS 1 TO 3 AS SOON AS POSSIBLE
MOUNTING OPTIONS
The Energy Manager can be fitted in either of the following options:
Direct Mounting
Recessed Box
Surface Box
(Cable restraints must be used)
CURRENT
Can Connect
TRANSFORMERS
up to 3 x CTs
Three sizes are available
most commonly supplied is
CT16. If monitoring 3 phase
connect one CT to each phase
and connect to terminals
1-2, 3-4 & 5-6. CTs come with
cable attached - polarity
isn't important.
IMPORTANT ALL WIRING SHOULD BE CARRIED
OUT BY A COMPETENT INSTALLER OR ELECTRICIAN.
QUALIFIED TO WORK WITH MAINS ELECTRICITY AND
BE IN ACCORDANCE WITH IEE & BUILDING REGULATIONS
AND IN SOME CASES, NOTIFIABLE TO BUILDING CONTROL.
DO NOT CARRY OUT THIS INSTALLATION IF UNDER
THE INFLUENCE OF ALCOHOL OR DRUGS.
CAN CONNECT UP TO 3 PULSE O/P UTILITY METERS.
PULSE INPUTS ARE AT LOW VOLTAGE.
If you have any questions about installing
this product please contact NetThings or
visit www.netthings.co.uk/support
8 STEPS TO A SUCCESSFUL INSTALLATION
1. Please choose a suitable location for the display and Energy Manager.*
2. Ensure that a 13A power supply is available at these chosen locations.
3. If your chosen location for the Energy Manager is not adjacent to the services you
require monitored then run cabling between these during your first fix installation.
4. Fix Energy Manager and display in their final position and make connections.
WARNING - Electric Shock Hazard! Make all cable connections to device
before powering up the unit. Always power-down before disconnecting cables.
NETTHINGS MEASUREMENT
UNIT BACKPLATE
upto 6 channels I/P
Fused
plus power supply
3A Spur
5. Make connections to the service you require to be monitored.**
6. Pair the display to the Energy manager.
7. Use energy on systems that you have connected to and check that this registers on your display.
8. Leave information with the end user for them to gain maximum usage of this product
*As this product communicates with WiFi frequencies the signal from the Energy Manager should easily reach the display
within modern houses but solid walls and obstructions can affect this. If you are in doubt about the effectiveness of the
signal strength please check before installation. ** Additional equipment may be needed to connect to other manufacturer's
products. Please contact NetThings if in doubt.
Display screen is fitted to a double recessed box.
Tablet in mount: 173mm x 99mm x 14mm
Fused 3A Spur
Back Plate: 154mm x 86mm
Heat Meters
Cable specification: Beldon 9501 or equivalent.
.
Outer cover clips over the backplate.
ELECTRIC METERS
If monitoring solar PV systems then fit an import export
meter and connect Energy Manager via pulse cables. Polarity
of connection is important here as it is an electronically
generated pulse. Observe pulse polarity when connecting.
HEAT METERS
Heat meters require to be pulse enabled and with a low
pulse setting i.e. 1 pulse per watt hour of energy.
Electric Meters
Water Meters
Gas Meters
WATER METERS
Water meters need to be specified as pulse enabled. Polarity
of pulse is not critical as pulses are mechanically generated.
GAS METERS
Ensure gas meters are pulse enabled and fitted with the
appropriate pulse block. As there are several different types
please ensure that the correct pulse block is ordered.
If unsure check our support website for further information.
www.netthings.co.uk/support