Operation; Warranty - Wells 8748 Owner's Manual

Iced tea brewing system
Table of Contents

Advertisement

OPERATION

Fig. 3 Brewer Operation Diagram
IMPORTANT:
Tank must be full of water
before pressing TANK
HEATER SWITCH "
ON
Heating elements will be
damaged if allowed to
operate without being
fully submerged in water.
Damage caused by
operating the brewer
without water in the tank
is NOT COVERED BY

WARRANTY.

A. START-UP
For initial start-up, or if the brewer has not been used for an
extended period of time:
".
♦ Be sure spray disk and brew gasket are properly installed in the
brew head.
♦ Be sure the water supply is properly connected and the water
supply valve is turned ON.
♦ Be sure the WATER TANK IS FILLED.
IMPORTANT: Fill the water tank before energizing this unit:
1.
Insert the brew chamber (empty) and place an empty dispenser in
place under the brew chamber.
2.
Be sure the TANK HEATER SWITCH is "
appropriate receptacle.
3.
Press The BREW switch. Water will start filling the tank. Run
several consecutive brew cycles until water flows from the brew
chamber.
5. When water stops dripping from the brew chamber, empty the
dispenser, then press TANK HEAT switch "
element will begin heating water in the tank. When the water has
reached the proper brewing temperature, the "READY TO BREW"
light will glow.
6
". Plug the unit into an
OFF
". The heating
ON

Advertisement

Table of Contents
loading

This manual is also suitable for:

8742

Table of Contents