MECHANICAL CABLE INSTALLATION
The front cable travels across the non-drive side slot, and
in the direction of the seat tube. The rear cable travels
along the drive side slot, and along the chainstay. When
complete, fi x the BB Cable Guide/Cover (BBG-0E0) into
place.
Ensure ferrules
Install Rear Derailleur Press-In Cable Stop
are used to cap
(CBS-DRPOUT).
shifter housing
at BB Cable
Guide/Cover.
As per manufacturer's instructions, install rear derailleur on rear
derailleur hanger, cut appropriate housing length, and attach cable.
30