Operation: Water - Scotsman FME504 Installation Manual

Scotsman ice service manual
Hide thumbs Also See for FME504:
Table of Contents

Advertisement

NME454, 654 & FME504, 804

OPERATION: Water

Water enters the machine through the 3/8" male
flare at the rear of the cabinet, goes to the water
reservoir which it enters through the float valve.
The water then goes out the bottom of the
Water Level: The correct water level should be
reservoir tank to the bottom of the evaporator.
checked when the machine is making ice. Check the
Reservoir overflow or evaporator condensation is
water level in the reservoir and compare it to the
routed to the drain. Water cooled models have a
horizontal line molded into the side of the reservoir.
separate water circuit for the cooling water: it
The correct level should be between
" above and
"
1
1
8
4
enters the fitting at the rear, goes to the water
below the line. If needed, bend the float arm up or
regulating valve, then to the water cooled
down to adjust the water level.
condenser and down the drain.
EVAPORATOR
DRAIN
RESERVOIR
WATER LEVEL
EVAPORATOR
DRAIN
ICE
CHUTE
WATER SCHEMATIC
January 2007
Page 14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fme804Nme454Nme654

Table of Contents