1 Technical data Boiler part description: 1. Heating chamber 2. Water cooled grid 3. Hot water 4. Flap 5. Flue ap 6. Oven 7. Upper grid (placing it up and down enables/disables the ²ummer mode") 8. Flow line 9. Return line 10. Flue 11.
1.1 Boiler properties TEMY PLUS P 25 IF yverll nominl power @kA PF xeessry drught @A QF ter ontent @lA RF wx working temperture WH¦g SF wx working pressure Q r TF eight PQS kg UF plue dimeter IRV mm VF idth...
1.3 Boiler shipment and storage he oiler must lwys stnd in its vertil positionF he rottion of the oiler during the shipment or instlltion represents serious risk nd n led to dmging the oilerF st is foridden to ple one oiler onto notherF he oiler n e stored only in losed rooms with no tmospheri...
Page 6
eertion vessel to e (tted t highest point of the system t top of oiler outletF his should inlude n over)ow system with vlve to dishrge ir from the oiler to prevent overhetingF e )ot operted vlve llows wter into istern (tted with n over)ow pipeF hen the system is (llingD the vlve remins openF hen the system is full the vlve losesF Temperature of hot water within a storage system.
2.1.2 Installation method 2 To be used in the case of the boiler being positioned and installed at a lower level than the installed pipe-work and radiators. As shown on Figure, following elements are connected along the FLOW: 1. Automatic air vent 2.
2.3 Filling up the boiler and installation with water Filling is done using the drain tap valve (to be found on the return line close to boiler). The lling process is done when no air is coming out through automatic air vent and pressure gauge is showing the value between 1,5 and 2,5 bar (closed systems).
2. Heating from below put small amount of solid fuel over the replace pipes (grid) (no ash should be present) and set up a re. The draught regulator is at the maximum position. When the re begins to burn, add larger amount of fuel and set draught regulator on desired temperature / position.
5 Modes of Operation Depending on the chosen mode of operation TEMY PLUS P can perform in three ways. 1. Winter mode - Predominatly Heating Mode 2. Combined mode 3. Summer mode - Predominantly Baking Mode...
sn the @predominntlyA heting modeD it is neessry to pull the )ue )p @position SA then to (re the wood inside the oilerF he drught regultor should e set within rnge VSEWS ¦gF sn the summer modeD the grid should e pled on the upper holders inside the hmer s shown on the imge elowF pirst the holders re pled nd then the grid itselfF gooking is possile in every working mode of the stoveEoilerF fefore ny opertion it is neessry to len the oiler nd hek the pressure of the entire systemF...
First connect the sensor (male thread 1/2) on the marked position on the boiler - female thread • 1/2 Now connect the cold water supply to the valve - female thread 3/4, then connect the valve to the • position 1 (cold water entrance), the boiler should have the prepared reduction 3/4-1/2 Connect the hot water exit toward the sewerage.
A Declaration Of Conformity Hereby we, Termomont d.o.o. with legal seat in Prhovacka bb, 22310 Simanovci, Serbia, declare under our sole responsibilty that the following product(s): Heating stove-boiler for solid fuel (wood, coal) TEMY PLUS P 25 manufactured in the following period: 2010-2011...
Need help?
Do you have a question about the temy plus p 25 and is the answer not in the manual?
Questions and answers