Termomont temy plus p 25 Directions For Use And Assembling

Termomont temy plus p 25 Directions For Use And Assembling

Stove-boiler for solid fuels
Hide thumbs Also See for temy plus p 25:

Advertisement

STOVE-BOILER FOR SOLID FUELS
Directions for use and assembling
Customer service:
Termomont d.o.o. Prhova£ka bb 22310 ’imanovci
tel. 022 80404, 022 80494 fax 022 80494 www.termomont.rs
20. april 2010

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the temy plus p 25 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Termomont temy plus p 25

  • Page 1 STOVE-BOILER FOR SOLID FUELS Directions for use and assembling Customer service: Termomont d.o.o. Prhova£ka bb 22310 ’imanovci tel. 022 80404, 022 80494 fax 022 80494 www.termomont.rs 20. april 2010...
  • Page 2: Table Of Contents

    Sadrºaj 1 Technical data TEMY PLUS P 25 1.1 Boiler properties ......
  • Page 3: Technical Data

    1 Technical data Boiler part description: 1. Heating chamber 2. Water cooled grid 3. Hot water 4. Flap 5. Flue ap 6. Oven 7. Upper grid (placing it up and down enables/disables the ²ummer mode") 8. Flow line 9. Return line 10. Flue 11.
  • Page 4: Boiler Properties Temy Plus P 25

    1.1 Boiler properties TEMY PLUS P 25 IF yver—ll nomin—l power @k‡A PF xe™ess—ry dr—ught @€—A QF ‡—ter ™ontent @lA RF w—x working temper—ture WH¦g SF w—x working pressure Q ˜—r TF ‡eight PQS kg UF plue di—meter IRV mm VF ‡idth...
  • Page 5: Boiler Shipment And Storage

    1.3 Boiler shipment and storage „he ˜oiler must —lw—ys st—nd in its verti™—l positionF „he rot—tion of the ˜oiler during the shipment or inst—ll—tion represents — serious risk —nd ™—n le—d to d—m—ging the ˜oilerF st is for˜idden to pl—™e one ˜oiler onto —notherF „he ˜oiler ™—n ˜e stored only in ™losed rooms with no —tmospheri™...
  • Page 6 eer—tion vessel to ˜e (tted —t highest point of the system —t top of ˜oiler outletF „his should in™lude —n over)ow system with v—lve to dis™h—rge —ir from the ˜oiler to prevent overhe—tingF e )o—t oper—ted v—lve —llows w—ter into — ™istern (tted with —n over)ow pipeF ‡hen the system is (llingD the v—lve rem—ins openF ‡hen the system is full the v—lve ™losesF Temperature of hot water within a storage system.
  • Page 7: Installation Method 2

    2.1.2 Installation method 2 To be used in the case of the boiler being positioned and installed at a lower level than the installed pipe-work and radiators. As shown on Figure, following elements are connected along the FLOW: 1. Automatic air vent 2.
  • Page 8: Filling Up The Boiler And Installation With Water

    2.3 Filling up the boiler and installation with water Filling is done using the drain tap valve (to be found on the return line close to boiler). The lling process is done when no air is coming out through automatic air vent and pressure gauge is showing the value between 1,5 and 2,5 bar (closed systems).
  • Page 9: Chimney

    2. Heating from below  put small amount of solid fuel over the replace pipes (grid) (no ash should be present) and set up a re. The draught regulator is at the maximum position. When the re begins to burn, add larger amount of fuel and set draught regulator on desired temperature / position.
  • Page 10: Modes Of Operation

    5 Modes of Operation Depending on the chosen mode of operation TEMY PLUS P can perform in three ways. 1. Winter mode - Predominatly Heating Mode 2. Combined mode 3. Summer mode - Predominantly Baking Mode...
  • Page 11: Overheat Protection Using The Thermostatic Valve (Closed System)

    sn the @predomin—ntlyA he—ting modeD it is ne™ess—ry to pull the )ue )—p @position SA then to (re the wood inside the ˜oilerF „he dr—ught regul—tor should ˜e set within r—nge VSEWS ¦gF sn the summer modeD the grid should ˜e pl—™ed on the upper holders inside the ™h—m˜er —s shown on the im—ge ˜elowF pirst the holders —re pl—™ed —nd then the grid itselfF gooking is possi˜le in every working mode of the stoveE˜oilerF fefore —ny oper—tion it is ne™ess—ry to ™le—n the ˜oiler —nd ™he™k the pressure of the entire systemF...
  • Page 12: Boiler Cleaning And Maintenance

    First connect the sensor (male thread 1/2) on the marked position on the boiler - female thread • 1/2 Now connect the cold water supply to the valve - female thread 3/4, then connect the valve to the • position 1 (cold water entrance), the boiler should have the prepared reduction 3/4-1/2 Connect the hot water exit toward the sewerage.
  • Page 13: A Declaration Of Conformity

    A Declaration Of Conformity Hereby we, Termomont d.o.o. with legal seat in Prhovacka bb, 22310 Simanovci, Serbia, declare under our sole responsibilty that the following product(s): Heating stove-boiler for solid fuel (wood, coal) TEMY PLUS P 25 manufactured in the following period: 2010-2011...