Scott Aerator DA-20 User Manual

Display aerator aerating fountain

Advertisement

We at Scott Aerator thank you for your purchase.
completely satisfied with your new Display Aerator and that it continues to operate smoothly
for many years to come. Please take a few moments to read through this document for proper
assembly, installation and maintenance to maximize the operating life of the unit.

This Kit Includes

1 - FLOAT PLATFORM
1 - PUMP ASSEMBLY
1 - STAINLESS STEEL WIRE BASKET
3 - SELF TAPPING SCREWS

Tools Needed

ONE 3/8" WRENCH OR SOCKET SCREWDRIVER
TWO 1/2" WRENCHES (OR PLIERS)
It is our goal to ensure that you are
DA-20
Display Aerator
Aerating Fountain

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DA-20 and is the answer not in the manual?

Questions and answers

Summary of Contents for Scott Aerator DA-20

  • Page 1 DA-20 Display Aerator Aerating Fountain We at Scott Aerator thank you for your purchase. It is our goal to ensure that you are completely satisfied with your new Display Aerator and that it continues to operate smoothly for many years to come. Please take a few moments to read through this document for proper assembly, installation and maintenance to maximize the operating life of the unit.
  • Page 2 1. Remove the two stainless steel bolts from the float. Fig. 1 2. Place pump assembly on end, propeller side facing up. Slip the float platform, with the Scott Aerator name and phone number facing up, over the pump assembly, aligning the two holes on the float platform to the pre-drilled holes on the pump assembly.
  • Page 3 The Scott Aerator Company has engineered all of its water features to eliminate the need for time consuming and costly Removing the Aerator from the water each winter will dry out and potentially winterizing products and procedures.
  • Page 4 All other product components are warranted for one year from date of purchase. Scott Aerator will repair or replace failed parts under warranty when the defective unit is returned to the factory, shipping prepaid, and factory inspection establishes that the part was defective.

Table of Contents