Insertion Magmeter
Model ISM 5.0
Manual Series 1.2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ISM 5.0 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Greyline ISM 5.0

  • Page 1 USER'S GUIDE Installation & Operation Instructions Insertion Magmeter Model ISM 5.0 Manual Series 1.2...
  • Page 2 Note: This page has been left blank intentionally.
  • Page 3 ISM 5.0 INSERTION MAGMETER Installation and Operation Guide www.greyline.com...
  • Page 4 GREYLINE assumes no responsibilities for this product except as stated in the warranty. • If the customer or any third party is harmed by the use of this product, GREYLINE assumes no responsibility for any such harm owing to any defects in the product which were not predictable, or for any indirect damages.
  • Page 5: Table Of Contents

    MECHANICAL INSTALLATION ........................10 3.3.1 Installation Kit ........................... 11 3.3.2 GREYLINE Standard Installation Hardware Kit ..............11 3.3.3 GREYLINE Hot Tap Installation Hardware Kit ..............11 3.3.4 Customer Supplied Installation Hardware ................12 3.3.5 Confirming the Stack Height ....................... 13 3.3.6 Installing Grounding Rings ......................
  • Page 6: Introduction

    This guide is the basic reference tool for all GREYLINE ISM 5.0 Insertion Magmeters. If you have not purchased all of the options, there will be references in this manual which are not applicable to your meter(s).
  • Page 7: Standard Features And Specifications

    This product is covered by one or more of the following patents: 6,431,011 and 6,463,807. ADDITIONAL REQUIRED HARDWARE All GREYLINE insertion type meters can be installed and removed via a 1” or larger full port ball valve without system shutdown. The terms “Standard”...
  • Page 8: Additional Hardware That May Be Required

    Grounding rings placed before and after the meter eliminate electrical noise that will interfere with the proper operation of the meter. GREYLINE provides grounding rings as an optional accessory. Grounding ring dimensional information and part numbers are listed below. For proper operation, grounding rings are required before and after the meter.
  • Page 9: Unpacking

    The sensor head should have a smooth continuous surface that is free of abrasions. All GREYLINE products are shipped insured unless the customer specifically requests otherwise. Please notify the shipping company and GREYLINE immediately if any items are damaged in transit. Save all packing material for inspection by the shipper.
  • Page 10: Installation, Removal & Adjustment

    Please read all instructions before attempting to insert or remove a flow meter. GREYLINE will be happy to assist with technical recommendations and to provide guidance by telephone or e-mail. On-site field engineering, installation and service is also available at additional cost.
  • Page 11 • Acceptable to install in vertical pipe • Position meter anywhere in upper 240° for horizontal pipe CLEARANCE REQUIRED FOR INSTALLATION 30” - 40” (76 - 100 cm) Depending on pipe size 5 Dia. Available Straight Run* For 3” and larger pipe diameters (A) Minimum straight run required Upstream obstruction upstream of meter location...
  • Page 12: Mechanical Installation

    CAUTION GREYLINE insertion style flow meters must be installed through a valve assembly. Failure to do so negates the ability to remove the meter without shutting down and draining the system. It will also result in an excessive amount of stem protruding from the pipe. Excessive stem lengths unnecessarily expose the meter to incidental damage.
  • Page 13: Installation Kit

    GREYLINE offers a wide range of installation hardware kits for commonly used pipe 3.2.1 Installation Kit materials. The kits are specifically designed for GREYLINE flow meters, and their use is recommended. The use of GREYLINE installation hardware kits accomplishes two important objectives.
  • Page 14: Customer Supplied Installation Hardware

    CAUTION In order to provide the flow meter with the correct stem length, GREYLINE must know the over- all height of the installation hardware as measured from the outside wall of the pipe to the top of the valve where the meter is installed.
  • Page 15: Confirming The Stack Height

    Flow meter stems are intentionally oversized to allow for variations of at least 2” in the stack height. Contact GREYLINE prior to installation if there is any question regarding stack height or stem length. This way GREYLINE can offer you credit for your meter if you decide to exchange the meter for one with a different stem length.
  • Page 16: Installing Grounding Rings

    (Please note that the straight run requirements shown above are only for locating the grounding rings with respect to the ISM 5.0 flow meter. The complete straight run requirements for this meter are found in Section 3.1 on page 11 of this manual.) 2.
  • Page 17: Installing The Flow Meter

    The clamping nut is not part of the sealing mechanism. Any leaks in this area indicate that the “O” ring is not sealing properly and you must contact GREYLINE for assistance. Page...
  • Page 18: Insertion Of The Meter

    INSERTION OF THE METER WARNING SYSTEM MAY BE UNDER HIGH PRESSURE. When adjusting the meter position or removing it, be sure to hold the electronics enclosure firmly by hand before SLOWLY loosening the positioning clamping nut. Failure to do this will allow the pressure to suddenly and rapidly force the meter from the pipe causing serious injury.
  • Page 19: Removal Of The Meter

    REMOVAL OF THE METER WARNING SYSTEM MAY BE UNDER HIGH PRESSURE. When removing the flow meter, be sure to hold the electronics enclosure firmly by hand before slowly loosening the positioning clamping nut. Failure to do this will allow the pressure in the pipe to suddenly and rapidly force the meter from the pipe causing serious injury.
  • Page 20: Wiring Connections

    Additional cable may be purchased from GREYLINE that will allow you to maintain the existing color coding. All electrical connections to the ISM 5.0 must be made through the 25ft cable provided with the meter. This cable is not designed to be removed in the field, and any attempt to do so will compromise the weather tight integrity of the enclosure.
  • Page 21 Wire Description Note Color 24±4 VAC 50-60 Hz @ 250 mA or Connect to 24VAC transformer or +24±4 VDC @ 250 mA DC power supply positive Connect to 24VAC transformer common Black (-) Isolated supply common or DC power supply common Green / See Section 3.5.2 for assistance in Earth connection (required to operate)
  • Page 22: Earth Connection

    3.5.2 Earth Connection ISM 5.0 Insertion Magmeters are designed to detect microvolt signal levels at the electrodes located on the sensor head. These signals are generated as conductive fluids flow through the magnetic field generated by the meter. If enough random electrical noise is present at the electrodes, it can interfere with the flow measurement.
  • Page 23: Start-Up & Commissioniing For Greyline Insertion Electromagnetic Flow Meters

    All wiring connections should be made at the end of the factory cable. Do not attempt to remove the factory installed cable or change the orientation of the electronics enclosure. Never connect power to analog or frequency output signal wires. GREYLINE ISM 5.0 Flow meters are not “loop powered” devices. Page...
  • Page 24: Start-Up And Commissioning

    (or scale factor) identified on the calibration tag & certificate. Confirm connection to Confirm that the flow meter serial number matches the GREYLINE display or Btu meter correct GREYLINE display serial number (when ordered together). or Btu meter (if ordered).
  • Page 25: Start-Up And Commissioning Worksheet

    START-UP AND COMMISSIONING WORKSHEET Please read all installation instructions carefully prior to proceeding with these steps. Use the following worksheet for checking off the commissioning steps and recording measured values. The following steps require flow in the pipe. Flow signal readings should be taken while holding the flow rate constant, if possible.
  • Page 26: Troubleshooting Guide

    Btu meter 4.4.1 Earth Connections & Electrical Noise Reduction ISM 5.0 Insertion Magmeters are designed to detect microvolt signal levels at the Introduction electrodes located on the sensor head. These signals are generated as conductive fluids flow through the magnetic field generated by the meter. If enough random electrical noise is present at the electrodes, it can interfere with the flow signal measurement.
  • Page 27 The most effective way to minimize the effects of electrical noise is to make sure that Minimizing Electrical Noise the pipe, the fluid and the flow meter body are all connected to earth ground. This accomplishes two important goals. First, it ensures that the pipe, fluid and flow meter are all at the same electrical potential.
  • Page 28: Conditions Of Sale

    DELIVERY AND TITLE: All product shipments are Ex Works shipping point and title passes to the Buyer at the time GREYLINE delivers the merchandise to the carrier. Risk of loss or damage to the product passes to the Buyer at the time GREYLINE delivers the product to the carrier.
  • Page 29: Applications Hotline

    Instruments may be returned to Greyline for service or warranty repair. Obtain an RMA Number from Greyline - Before shipping a product to the factory please contact Greyline by telephone, fax or email to obtain an RMA number (Returned Merchandise Authorization). This ensures fast service and correct billing or credit.