Blackrock Microsystems Digital Hub Instructions For Use Manual

Blackrock Microsystems Digital Hub Instructions For Use Manual

Advertisement

Quick Links

630 Komas Drive
|
Suite 200
Salt Lake City
|
UT 84108
P +1 801.582.5533
|
F +1 801.582.1509
www.blackrockmicro.com
Blackrock Digital
Instructions for Use
Revision 1.00 / LB-0907 – Digital Hub IFU
©2017 Blackrock Microsystems®, LLC
|
USA
Hub

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Digital Hub and is the answer not in the manual?

Questions and answers

Summary of Contents for Blackrock Microsystems Digital Hub

  • Page 1 630 Komas Drive Suite 200 Salt Lake City UT 84108 P +1 801.582.5533 F +1 801.582.1509 www.blackrockmicro.com Blackrock Digital Instructions for Use Revision 1.00 / LB-0907 – Digital Hub IFU ©2017 Blackrock Microsystems®, LLC...
  • Page 2: Table Of Contents

    Support ........................10 Table of Figures Figure 1: Blackrock Digital System Overview ..................4 Figure 2: Front (top) and Back (bottom) of the Digital Hub ..............6 Figure 3: Input Connector Pin-Out ....................7 Figure 4: Instruction for Assembly ..................... 8 Revision 1.00 / LB-0907 –...
  • Page 3: Warnings And Contraindications

    IEC60101-0102 Danger of Electrostatic Discharge (ESD) • The Digital Hub is part of a recording system and should not be used in applications involving stimulation. • Do not use the Digital Hub with any device that has not been approved by Blackrock Microsystems.
  • Page 4: Introduction

    CerePlex series headstages for high fidelity transmission and recording of extracellular spikes and local field potentials from the brain. The Blackrock Digital Hub converts digital signal to an optic- digital format which is sent directly to the Blackrock Neural Signal Processor (NSP). This dramatically reduces the noise introduced to the signal during transmission.
  • Page 5: Specifications

    Water Ingress Protection Ordinary Equipment, not fluid resistant, IP20 Operating Environment 10˚C to 40˚C, 5 to 95% R.H. (non-condensing) Storage Environment -20˚C to 50˚C, 5 to 100% R.H. (non-condensing) Revision 1.00 / LB-0907 – Digital Hub IFU ©2017 Blackrock Microsystems®, LLC...
  • Page 6: Overview Of Hardware

    There are six LED’s on the Digital Hub which can give the user information about the device status. If the Digital Hub is powered (plugged in) the “Power” LED will be blue as in Fig 3-1. If the fiber-optic connection between the NSP and the Digital Hub is present, the “Fiber Optic Data Link”...
  • Page 7: Power

    96 channels to the Neural Signal Processor (NSP) but input three will send only the first 32 channels to the NSP. The Digital Hub will always send the first 128 channels to the NSP in this way, unless there are less than 128 channels in which case it will send all channels.
  • Page 8: Setting Up The Cereplex Exilis

    1. The following instructions are for the Digital Hub which can support up to 128 channels of data. Assembly illustrations are shown in Figure 4. 2. Make sure the Digital Hub is plugged in and the power switch is in the “Off” position before making any connections.
  • Page 9: Cleaning And Maintenance

    Warning: Unplug the device from all power and devices before performing any cleaning and/or maintenance. The Digital Hub should be kept dry and free of debris. A gentle cleaning with small amounts of isopropyl alcohol can be used to clean the outside of the device if necessary.
  • Page 10: Return Merchandise Authorization (Rma)

    Support team through the contact information below: Manuals, Software Downloads, and Application Notes www.blackrockmicro.com/technical-support Issues or Questions www.blackrockmicro.com/technical-support support@blackrockmicro.com U.S. +1 (801) 839 1062 Europe +49 (0) 511 132 211 10 Revision 1.00 / LB-0907 – Digital Hub IFU ©2017 Blackrock Microsystems®, LLC...

Table of Contents