Unit Clearances - Ne090 & Ne/Nf120 - York NE090 Technical Manual

Split-system evaporator blowers 7.5 thru 20 nominal tons, export only r-410a
Table of Contents

Advertisement

1-23/32 KNOCKOUT
(R em oved on ly wh en
El ectr ic H eat Accessory
is used )
2-1/ 4
23
1-5/ 8
AI R
2
IN
FIGURE 8 - UNIT DIMENSIONS - NE090 & NE/NF120
ACCESSORIES
ELECTRIC HEATER - Add 14-1/4" to unit height when used.
SUPPLY AIR PLENUM - Add 27-1/2" to unit height when used.
BASE - Add 20" to unit height when used.
TABLE 23: UNIT CLEARANCES - NE090 & NE/NF120
MINIMUM CLEARANCES
Side with RETURN AIR opening
Side with SUPPLY AIR opening
Side with PIPING CONNECTIONS
Side opposite PIPING CONNECTIONS
16
52-1/4
15-3/8
18-7/8
AI R
OU T
1
15
2-5/ 8
3-1/ 4
25-1/8
48
1
2
090-120
24"
1
24"
24"
1-3/8" KN OCKOUT
FOR POWER WI RI NG (Back Panel)
Do not re mo ve th is kno ckout when
th e un it is e quipped wi th an El ec tric
Heat A ccessory. Refer to de ta il of
th e Heat er Accessory for powe r
wi ri ng a ccess open in g
7/8" HO LE W/ BUSH IN G
FOR CONTRO L
WI RI NG
(B ack Pane l)
3-5/ 8
4-1/ 4
6-3/ 4
5/ 8
16-1/8
25-7/8
BLOWER MO TO R
A ND DR IV E
A CCESS PANE L
(T hi s side only)
HOLE WI TH GROM -
ME T FOR 1/2 O. D.
LI QU ID LI NE
51-1/8
4
HOLE WI TH GROM -
ME T FOR 1-1/8 O. D.
8-3/ 8
S UCT IO N LINE
1-3/ 8
1-3/ 4
1-1/ 8
7/8 O. D. DRA IN
CONN . (M ust be
tr apped)
FI LTER ACCESS PANE L
(W hen un it is insta lle d in
a hori zontal pos itio n, do
not bl o ck th is area wi th
re frig erant pi pi ng )
TABLE 23: UNIT CLEARANCES - NE090 & NE/NF120
2
Bottom
1. Overall dimensions of the unit will vary if an electric
heater, a supply air plenum or a base is used.
2. Allow enough clearance to trap the condensate drain
line.
1"
679948-YTG-A-0111
-
Unitary Products Group

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ne120Nf120Ne240Ne180

Table of Contents