Hubbard Systems Scotsman NW 458 Installation Manual

Modular cubers

Advertisement

Installation Guide for
NW Scotsman Modular Cubers
Installation Guide for Scotsman Modular Cuber.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Scotsman NW 458 and is the answer not in the manual?

Questions and answers

Summary of Contents for Hubbard Systems Scotsman NW 458

  • Page 1 Installation Guide for NW Scotsman Modular Cubers Installation Guide for Scotsman Modular Cuber.
  • Page 2 Unpacking  Remove the two banding strips securing equipment to pallet.  Remove cardboard carton and packaging material.  Inspect exterior of machine for any potential damage.  Remove Front, Left & Right hand panels & release machine from the pallet Remove from inside the machine (Or supplied separate ‘Installation Kit –...
  • Page 3 Check the following:  Ambient temperature - minimum 10°C, maximum 40°C  Adequate space at rear of machine for water and drain connections.  Minimum airflow clearance requirement of 15cm to both sides of machine. Note: if clearance is less, ice production rate could decrease by as much as 25% due to potential overheating if an Air Cooled version is used Service Connections: Check ID on rear of machine for correct voltage (e.g.
  • Page 4 Prior to Start Up: Inside the unit, Remove all ORANGE ‘transit tapes’ from areas of the water circuit, ice curtain and spray plate/bars, ensure any spray plate(s) are correctly positioned and the deflector curtain located correctly on the brackets/holders in front of the sump chamber.
  • Page 5  Any adjustments to settings for ice size should be discussed with the engineer installing the equipment or Hubbard Systems Technical Department in the first instance. NOTE - The above procedures are designed to supplement full guidance given in the service manual, not replace it.

Table of Contents