Installation Guide for NW Scotsman Modular Cubers Installation Guide for Scotsman Modular Cuber.
Page 2
Unpacking Remove the two banding strips securing equipment to pallet. Remove cardboard carton and packaging material. Inspect exterior of machine for any potential damage. Remove Front, Left & Right hand panels & release machine from the pallet Remove from inside the machine (Or supplied separate ‘Installation Kit –...
Page 3
Check the following: Ambient temperature - minimum 10°C, maximum 40°C Adequate space at rear of machine for water and drain connections. Minimum airflow clearance requirement of 15cm to both sides of machine. Note: if clearance is less, ice production rate could decrease by as much as 25% due to potential overheating if an Air Cooled version is used Service Connections: Check ID on rear of machine for correct voltage (e.g.
Page 4
Prior to Start Up: Inside the unit, Remove all ORANGE ‘transit tapes’ from areas of the water circuit, ice curtain and spray plate/bars, ensure any spray plate(s) are correctly positioned and the deflector curtain located correctly on the brackets/holders in front of the sump chamber.
Page 5
Any adjustments to settings for ice size should be discussed with the engineer installing the equipment or Hubbard Systems Technical Department in the first instance. NOTE - The above procedures are designed to supplement full guidance given in the service manual, not replace it.