Download Print this page

Step 4 - Check Operation - GE Record Plus Installation Instructions Manual

Molded case circuit breaker accessories

Advertisement

Step 4 – Check Operation
To check the RESET operation, rotate the
1.
mechanism handle counterclockwise toward
the RESET position until the breaker resets.
To check the ON–OFF operation of the
2.
breaker, depress the interlock release and
rotate the handle between the ON and OFF
positions.
With the rotary handle and the circuit breaker
3.
in the ON position, press the trip button to
verify that the rotary handle indicates TRIP.
Complete the installation of the circuit breaker
4.
according
to
DEH40463.
These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency
that may be met in connection with installation, operation, or maintenance. Should further information be desired or
should particular problems arise that are not covered sufficiently for the purchaser's purposes, the matter should be referred
to the GE Company. The circuit breaker is a sealed unit that contains no user-serviceable parts. Tampering with the seal will
void the warranty.
g
DEH40914 R03 1203
installation
instructions
General Electric Company
41 Woodford Ave., Plainville, CT 06062
www.geindustrial.com
© 2003 General Electric Company
GE Industrial Systems

Advertisement

loading