GE Record Plus Installation Instructions Manual page 2

Molded case circuit breaker accessories

Advertisement

Product Description
These
instructions
procedure for the integral handle operator accessory,
Record Plus™
type TDR, on
as illustrated in Figure 1. The type TDR handle is
designed for direct mounting to the breaker in either
vertical (cat. no. FCNRC, FCNRCN and FCNRCNI)
or horizontal orientation (cat. no. FCNRD and
FCNRDN). A door ring on the handle operator
projects through a hole in the front of the enclosure
door. These handles are suitable for use with NEMA
1, NEMA 12, or NEMA 12K enclosures.
An interlock kit (cat. no. FCFRDRCK) for adapting
the enclosure door and the door ring gasket (cat. no.
SEFRGSK) are available separately.
Figure 2. Locking the circuit breaker OFF.
Step 1 – Unpack and Inspect
Unpack the integral handle operator kit and inspect
the parts for any shipping damage. Verify that all
parts are supplied, as listed in Table 1.
Note that the numbers in brackets in the following
figures and installation instructions refer to the item
numbers in Table 1.
Item
Description
1
Operator assembly
2
Screw, #8-32 x 2.81"
3
L bracket
4
Lock washer
5
Screw, #8-32 x
6
Grounding cable
7
SEMS screw
Table 1. Parts supplied in the type TDR integral handle operator kit.
describe
the
installation
FC100 circuit breakers,
Handle
Locking Hasp
Padlock
Slot
Qty.
1
4
1
4
5
/
4
16
1
1
Step 2 – Installation
Use the following procedure to install the handle
operator kit to the circuit breaker. Outline drawings
showing the dimensions of the installed operator are
found in fig 8, fig 9 and fig 10.
Push the trip button to place the breaker
1.
operating handle in the TRIP position, as
illustrated in Figure 3.
Mount the breaker to the enclosure with the
2.
four #8-32 x 2.81" screws [2], as shown in Figure
3. Tighten the screws to 16 - 20 in-lb.
Attach the L bracket [3] to the breaker with two
3.
#8-32 x 5 /16" screws [5] and lock washers [4], as
shown in Figure . Tighten the screws to 16 - 20
in-lb.
Turn the rotary handle in the handle operator
4.
assembly [1] to the TRIP position. Mount the
operator assembly to the breaker with a
grounding cable [6], two #8-32 x 5 /16" screws
[5] and lock washers [4], as shown in fig5. The
top of the assembly must rest on the L bracket
[3]. Tighten the screws to 9 -11in-lb.
Secure the handle operator assembly [1] to the
5.
L bracket [3] with the SEMS screw [7], as shown
in Figure 6.
Use the identical procedure to install the horizontal-
mount rotary handle, as shown in Figure 7
Step 3
Handle Operation
-
The mechanism operates with a rotary motion from
the OFF/RESET position to ON.
In FCNRC/D, FCNRCN /DN, when the breaker is
ON, the interlock arm prevents the enclosure door
from opening. If it is necessary to open the door
with the breaker ON, turn the interlock defeat screw
clockwise to disengage the interlock arm.
To lock the handle in the RESET position, pull the
hasp out of the end of the handle and through the
slot in the door ring, as shown in Figure 2. Attach a
padlock through the slot in the hasp to prevent the
handle from rotating. The locking hasp accepts up
to three padlocks with 1 /4-inch shanks.
.